Laserfiche WebLink
<br />I <br />1 <br />t <br /> <br />1 <br />J <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />, <br /> <br />2.05.01 Fee Proposal (continued) <br />n. Extraordinary Maintenance <br /> <br />A. Material: Contractor's cost for the supply plus (+) 15 % per Section 2.04.19. <br /> <br />B. Labor: Contractor's rates (including all fiinge benefits, markup, over heads, etc.) for all <br />job classifications involved in extraordinary maintenance. <br /> <br />Item # Title Straight Time Overtime n.T <br />11. Superintendent $ 7S.00 /hr. $ RIo.Q/) /hr. ,; 10&. CD) <br />12. Engineering Technician $ 8z..00/hr. $ 10B.oo /hr. </, 3S/7O} <br />13. Laboratory Technician $ ft:,O . 00 /hr. $ 79 .()() /hr. rI 98 lUJ)h <br />14. Maintenance Technician - Lead $ 62. {JO /hr. $ 82.o0/hr. Q/02""/I-1C <br />15, Maintenance Technician $ 52.,OO/hr. $ 65. 00 /hr. ,r BO.D7fh2 <br />16. Utility Technician - Lead $ 82.00/hr. $ IOfj,lJO /hr. 1I/3S:tYb/;" <br />17. Utility Technician $ bZ. 00 /hr. $ 82.00/hr. .f.'/ 0 2..CJ"/J-I, <br />18. Lead High Voltage St. Light Tech. $ 82.00/hr. $ 108. {)() /hr. -/;3::;: CD /;.fA <br />19. Street Light Technician $ l.f 7. 00 /hr. $ 62.00/hr. ~77.7tfK. <br />20. Service Laborer $ 6/,00 /hr. $ SI.oo /hr. If 99. '7sft,t< <br /> <br />C. Labor and Material: <br />Item # Bid Item Unit Unit Price <br />21. Install 6' diameter circular loop (4 loops or less at EA $ LFBs-. 00 <br /> the same intersection) <br />22. Install 6' diameter circular loop (5 loops or more at EA $ 27S'. 00 <br /> the same intersection) <br />23. InstalL 6' diameter circular loop (24 loops or less EA $Z7r-,oo <br /> within a mile) . <br />24. Install 6' diameter circular loop (25-48 loops within EA $ '2.7-S: 00 <br /> a mile) <br />25. Install 6' diameter circular loop (49 loops or more EA $ '270.00 <br /> within a mile) <br /> 19 <br />