Laserfiche WebLink
<br />, .. <br /> <br /> 2'.05.01 Fee Proposal (continued) <br /> Item # Type of Equipment Cost <br /> 47. Crane Truck $ goo .00 /job trip <br /> 48. Water Truck $ /StJ. 00 /j ob trip <br /> 49. Dump Truck $ /51).00 /job trip <br />1 50. Big Concrete Saw $ 80. 6CJ /job trip <br />1 51. Complete Paint Rig $ /(){J.oo /job trip <br />, $ ICO.OD /job trip <br /> 52. Jack Hammer/Compressor <br /> 53. Trencher and Backhoe $ 6lK 06 /job trip <br /> 54. Vacuum Truck $ 24& 00 /job trip <br /> IV. Cellular Phone / Radio Equipment <br /> <br />The Contractor shall provide four (4) cellular phone and/or radio equipments for City staffs use <br />during this contract (two for traffic signal maintenance and two for street light maintenance) to <br />facilitate communication with the Contractor at the Contractor's cost. <br /> <br />V. Bid Scenario - Street Light <br /> <br />A. <br /> <br />For comparison purposes please bid the repair scenario utilizing the previous bid <br />prices. <br /> <br />i <br />j <br /> <br />I <br />I <br /> <br />The City of Santa Ana has experienced a street lighting outage in a neighborhood with <br />series high voltage street lighting. The outage encompasses several streets in the <br />neighborhood affecting 24 cast iron double king street lights with 2500 lumen lamps. A <br />night drive was required to identify the scope of the outage. The lighting repairs required <br />tb.ree (3) working days to complete the repairs. After completion of USA markings, the <br />following personnel, equipment and materials were dispatched to repair the lighting. <br /> <br />1. Two service personnel: Lead High Voltage Street Light Technician and a Service <br />Laborer for three days. <br /> <br />Cost: -9f3E'J9b. DO <br /> <br />2. Night Drive: <br />Cost: ~ /2 '}. DO <br /> <br />3. Equipment: Service truck with a compressor for three days. <br />Cost: ..,c 4LO..s-.OD <br /> <br />21 <br />