Laserfiche WebLink
<br />Public Road Improvement 12104/00 <br />Estimated Costs <br />Form Approved-A VP Law <br /> <br />Improvements to Existing Public Road At Grade Crossing <br />For Main Street, DOT 761253H <br />M.P. 520.20, Santa Ana Industrial Lead, Los Nietos Subdivision <br />Santa Ana, California <br /> <br /> <br />TIDS AGREEMENT, executed in duplicate this I;l.. day of tlel-:200s' by <br />and between UNION PACIFIC RAILROAD COMPANY, a Delaware corporation (hereinafter the <br />"Railroad"), and CITY OF SANTA ANA, a municipal corporation of the State of California <br />(hereinafter the "Political Body"), WITNESSETH: <br /> <br />RECITALS: <br /> <br />The Political Body has requested the Railroad to improve the existing Main Street crossing, <br />at grade, along, over and across the Railroad's track and right of way at Mile Post 520.20, Santa <br />Ana Industrial Lead, Los Nietos Subdivision, DOT No. 761253H, in City of Santa Ana, Orange <br />County, California to which the Railroad is agreeable, but solely upon terms and conditions <br />hereinafter set forth. <br /> <br />AGREEMENT: <br /> <br />NOW THEREFORE, in consideration of the premises and of the promises and conditions <br />hereinafter set forth, the parties hereto agree as follows: <br /> <br />1. The Railroad shall furnish all labor, material, equipment and supervision for, and <br />shall (a) remove the existing asphalt crossing, (b) install a 128 ft. precast concrete crossing, (c) field <br />weld rail, (d) relay track at crossing with 136/# rail, (e) renew the crossties, and (0 surface the track <br />with new ballast, all at the intersection of the Railroad's Santa Ana Industrial Lead with Main <br />Street at Mile Post 520.20 in Santa Ana, Orange County, California. <br /> <br />2. The Political Body agrees to reimburse the Railroad for fifty percent (50"/0) of <br />Railroad's aetual labor and material costs assodated with the work and materials described in <br />Section 1 above. The Railroad estimates such cost to be One Hundred Twenty Six Thousand Seven <br />Hundred and Twenty Three Dollars ($126,723.00), as set forth in Estimate of Material and Force <br />Account dated June 17,2005 marked Exhibit A, hereto attached. and hereby made a part hereof. <br />During the performance of such work the Railroad will provide progressive billing to Political Body <br />based on Railroad's actual costs. Actual costs to the Railroad shall include customary additives to <br />materials, services and labor provided by the Railroad. Within 120 Days after Railroad has <br />completed its work, the Railroad will submit a final billing to Political Body for any balance owed. <br />Political Body shall pay the Railroad within thirty (30) days of its receipt of all bills submitted by <br />the Railroad. <br /> <br />3. The Railroad, at its cost, shall maintain the crossing between the track tie ends. If, <br />in the future, the Political Body elects to have the surfacing material between the track tie ends <br />replaced with paving or some surfacing material other than concrete crossing, the Railroad, at the <br />Political Body's expense, shall install such replacement surfacing. <br /> <br />4. The Political Body, at its sole cost and expense, shall provide traffic control, <br />barricades, and all detour signing for the crossing work, provide all labor, material and equipment <br />to install concrete or asphalt street approaches, and if required, will install advanced warning signs, <br />and pavement markings in compliance and conformance with the Manual on Uniform Traffic <br />Control Devices. <br /> <br />C:~_~I:Jl1\M;l'~ta\W~ANA."""""'" 1 <br />