Laserfiche WebLink
<br />FUNDING ANALYSIS <br /> <br />PROJECT NO. 1758 <br />ADAPTIVE DOWNTOWN SIGNAL SYSTEM <br /> <br />Construction Contract <br />Contract Administration <br />Inspection and Testing <br />Contingencies <br /> <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br /> <br />Exhibit 2 <br /> <br />23A-3 <br /> <br />$842,721 <br />$26,407 <br />$63,000 <br />$84,272 <br /> <br />$1,016,400 <br />