Laserfiche WebLink
<br />RINCON CONSULTANTS, INC. <br /> <br />Standard Fee Schedule for Environmental, Geoenvironmental, and Planning Services <br /> <br />Rincon Consultants' fee schedule is based on the time that is charged to projects by our professionals and <br />support staff. Direct costs associated with completing a project are also billed to the project as discussed <br />under Reimbursable Expenses below. The following sets forth the billing rates for our personnel. <br /> <br />Professional and Technical Personnel Hourlv Rate <br /> <br />Principal.......... ......... ................. ...... ............ ........................... ................... ....$ 130-150/hour <br />Supervising Environmental Scientist/Planner ........................................$ 110-125/hour <br />Senior Environmental Scientist/Planner.......... .............. ............. .............$ 95-110/hour <br />Environmental Scientist/Planner ................ ...... .................................. ......$ 85-95/hour <br />Environmental Technician ............. ....... .............. ..... ..................................$ 65-85/hour <br />Environmental Field Aide ..........................................................................$ 45-55/hour <br />AutoCAD, GIS Technician .........................................................................$ 75-85/hour <br />Graphic Designer.. ........... ............. ........................ .................. .................. ...$ 65/hour <br />Clerical/ Administrative Assistant............................................................$ 55/hour <br /> <br />Expert witness services consisting of depositions and in-court testimony are charged at a rate of $250/hour. <br /> <br />Equipment Unit Rate <br /> <br />Photo-Ionization Detector (PID)................................................................$ 100/ day <br />Four Gas Monitor ........................................................................................$ 100/ day <br />Oil-Water Interface Probe...........................................................................$ 75/ day <br />Water Level Indicator .................................................................................$ 25/ day <br />Temperature-pH-Conductivity Meter ......................................................$ 40/ day <br />Bailer..... .......................................................................................................$ 20/ day <br />Disposable Bailer .........................................................................................$ 15/ each <br />Hand Auger Sampler ..................................................................................$ 50/ day <br />Brass Sample Sleeves...................................................................................$ 8/ each <br />Decontamination Equipment.....................................................................$ 20/ day <br />Level C Health and Safety Equipment .....................................................$ 50/person/ day <br />Submersible Pump ......................................................................................$ 150/ day <br />DC Purge Pump...........................................................................................$ 30/ day <br />Dissolved Oxygen Meter ............................................................................$ 40/ day <br />Turbidity Meter ...........................................................................................$ 25/ day <br />Sound Level Meter ......................................................................................$ 100/ day <br /> <br />GPS Locator ..................................................................................................$ 30/ day <br />Integrated GPS/GIS ....................................................................................$ 500/ day <br />Field Computer Equipment .......................................................................$ 40/ day <br />Vacuum Gas Chamber Sampler ................................................................$ 20/ day <br />Digital Projector/ Computer.......................................................................$ 40/ day <br />Aneometer ....................................................................................................$ 25/ day <br />Soil Vapor Extraction Monitoring Equipment.........................................$ 125/ day <br /> <br />Photocopvin~ and Printing <br /> <br />Photocopies will be charged at a rate of$0.08/copy for single-sided copies and $0.16 for double-sided <br />copies. Colored copies will be charged at a rate of $1.00/ copy for single-sided and $2.00/copy for double- <br />sided or l1"xl7" copies. Oversized maps or display graphics will be charged at a rate of $7.00/square fool. <br /> <br />Reimbursable Expenses <br /> <br />Expenses associated with completing a project are termed Reimbursable Expenses. These expenses do not <br />include the hourly billing rates described above. Reimbursable expenses include, but are not limited to, the <br />following: <br /> <br />1. Direct costs associated with the execution ofa project are /Jilled at cost plus 15% to cover General and <br />Administrative seroices. Direct costs include, but are not limited to, laboratory and dn'lling services charges, <br />subcontractor services, authorized travel expenses, permit charges and filing fees, printins and graphic charges, <br />peifonnance bonds, sample handling and shipment, equipment rental other than covered fly the above charges, etc. <br /> <br />2. Vehicle use in company-moned vehicles will be /Jilled at a day rate of$50/day for regular terrain vehicle use <br />and $100 per day for 4-WD off-road vehicle use, plus $0.50/mile for mileage over 50 miles per day. For <br />transportation in employee-awned automo/Jiles, a rate of$0.50/mile will be charged. Rental vehicles will be <br />/Jilled at cost plus 15%. <br /> <br />January 2005 <br />