My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SOUTHLAND CAR COUNTERS 5 -2005
Clerk
>
Contracts / Agreements
>
S
>
SOUTHLAND CAR COUNTERS 5 -2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:09:48 PM
Creation date
10/6/2005 2:45:29 PM
Metadata
Fields
Template:
Contracts
Company Name
Southland Car Counters (Field Data Services)
Contract #
A-2005-114
Agency
Public Works
Expiration Date
6/6/2006
Insurance Exp Date
9/30/2007
Destruction Year
2011
Notes
Amended by A-2005-114-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />4F IELDDATASERVICES <br />~ Southland Car Counters <br /> <br />Corporate Office <br />8370 Wilshire Blvd. Ste 209 <br />Beverly Hills, CA 90211 <br />T- (323) 782-0090 <br />F- (323) 375-1666 <br />Email: InfoilUfdsdata.com <br /> <br />., <br /> <br />KEY PERSONNEL <br /> <br />Traffic Data Collection Specialists <br /> <br />Key personnel will be available and dedicated for the duration of the project, to perform all required tasks <br />and meet City program objectives. All FDS personnel have worked together previously and successfully <br />completed large traffic data collection projects for public sector clients. All FOS personnel involved in this <br />project have worked successfully with the Santa Ana staff on previous projects and look forward to <br />providing you with the highest level of professional consulting services. Abbreviated resumes of key <br />project staff are presented in the paragraphs below. <br /> <br />Steve Souter, Chief Operating Officer- <br />Steve Souter will serve as Project Manager for this project. He has 16 years of extensive technical and <br />managerial experience in traffic data collection. He has served as project manager for numerous large data <br />collection efforts on past FDS projects. Recent relevant major projects include citywide/county wide traffic <br />data collection for: Santa Ana, Irvine, Orange County, Santa Clarita, San Diego, San Jose, Pomona, and La <br />Mesa. Mr. Souter's familiarity with the Santa Ana personnel and procedures, and the study locations make <br />him uniquely suited to work with the City Project Manager to ensure a smooth and successful completion of <br />this project. <br /> <br />Bob Bowen- Orange County Area Manager <br />Bob Bowen will serve as the ITM Field Manager. Mr. Bowen is our senior Field Manager and has over 12 <br />years of extensive technical experience in traffic data collection and field management experience with <br />FDS. <br /> <br />Darren Moreland <br />Darren Moreland will serve as the ADT Field Manager and has over 6 years experience collecting and <br />supervising ADT collection efforts. <br /> <br />Data Collectors <br />The number of data collectors will be determined based on final agreed to data collection requirements. No <br />part timer workers or temporary workers will be used. Full time personnel with 3 - 30 years' experience will <br />be used for this job. <br /> <br />The FDS management / organization structure is shown below: <br />
The URL can be used to link to this page
Your browser does not support the video tag.