My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRANSCORE ITS 3 - 2005
Clerk
>
Contracts / Agreements
>
T
>
TRANSCORE ITS 3 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:01:09 PM
Creation date
10/6/2005 4:53:12 PM
Metadata
Fields
Template:
Contracts
Company Name
TransCore ITS, Inc.
Contract #
A-2005-093
Agency
Public Works
Council Approval Date
5/2/2005
Expiration Date
6/30/2007
Insurance Exp Date
4/1/2008
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'0 <br /> <br />TRANSEORE <br /> <br />626 Wilshire Blvd. <br />L os Angeles, CA 90017 <br />213.327.0922 tel 213.327.0892 fax <br /> <br />April 20, 2005 <br /> <br />T.c, Sutaria <br />City of Sauta Ana <br />Traffic Engineering <br />20 Civic Center Plaza, M-43 <br />Santa Ana, CA 9270 I <br /> <br />Subject: Scope of Work for Santa Ana On-call Services 2005 <br /> <br />Dear Mr, Sutaria: <br /> <br />The following provides TrausCore ITS's preliminary scope of work, aud budgetary cost estimates for work items <br />to be performed as part of TrausCore's On-Call services contract for the 2005 calendar year, The work conducted <br />under this contract will be performed on a time aud materials basis in accordance with the attached labor rates. <br />Prior to performing any of the tasks listed, TransCore will work with the City to develop a more detailed scope of <br />work and revised cost estimates, <br /> <br />Task I - On-going System Maintenance and Enhancements <br /> <br />TransCore will provide system maintenance and enhancement activities during the course of the year. System <br />maintenance aud enhancement activities will be performed in response to specific requests from the City to <br />investigate, troubleshoot, and repair of system malfunctions, and implementing enhancements. <br /> <br />Task 2 - Migrate Existing Traffic Management Systems to New TeS Workstations <br /> <br />The Santa Ana TMC will be installing new workstations as part of the phased MIST implementation. These new <br />workstations will need to have existing traffic management systems migrated to them in order to maintain full <br />control of all intersections, As part of this task, TransCore will migrate their systems (e.g" A TMS, Explorer, TIS, <br />etc.) to the new workstations, and manage/coordinate the migration of systems supported by other vendors (e,g., <br />Iteris [PIDB], Cohu [NetCarn], etc.), (This estimate assumes migrating systems to 4 workstations and that there <br />are no chauges required to the servers,) <br /> <br />Task - HA TIHAR Recommendation & Implementation Plan <br /> <br />TransCore will perform a high-level analysis of the TMC's HAR and HAT requirements and will recommend <br />potential vendor(s) based on functionality and estimated cost. TransCore will work the recommended vendor(s) <br />to develop a detailed cost and implementation plan for both the HAR and HAT systems, If the City decides to <br />proceed with this project, TrausCore will manage the implementation as part of Task I, <br /> <br />Task 4 - Miscellaneous Engineering Services <br /> <br />TransCore will perform miscellaneous engineering service as directed by the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.