My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1985
Clerk
>
Minutes
>
CITY COUNCIL
>
MINUTES INDEX
>
1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:15:52 PM
Creation date
5/9/2003 9:09:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page No. <br /> <br />01/13/92 <br /> <br />PAGE NUN ACT <br /> <br />29 <br /> <br />DESCRIPTION <br /> <br />ELECTRONIC LEGISLATIVE INDEX <br />MINUTES BOOK INDEX - 1985 <br />CITY OF SANTA AMA <br /> CLERK OF THE CCXJNCIL <br /> <br />521 02G A <br />159 60B A <br />107 02B A <br />201 02D A <br />307 03C A <br />107 02B A <br />46/* 03C A <br />274* 02B A <br />376 02B A <br />493 60E A <br />463 02A A <br />58~ 03B A <br />464 030 A <br />336 02E A <br />202 02E A <br />254 03B A <br />202 02E A <br />202 02F A <br />254 03C A <br />20 12D A <br />517 60E A <br />178 02B A <br />426 03C A <br />336 02F A <br />426 O3O A <br />36 02B A <br />40 12G A <br />/+ 04A A <br />37 04A A <br />178 O~A A <br />27-/ 04A A <br />309 178 C <br />373 178 A <br />429 17B B <br />485 17A C <br />512 04A A <br />&26 03E A <br />152 02D A <br />426 02A A <br />427 12B A <br />520 020 A <br />464 03E A <br />13/* 02B A <br />232 35B A <br />225 02B A <br />225 02B A <br />480 02F A <br />58 02A A <br /> <br />PROd 2119 CITYWIDE AERIAL PHOTOS <br />PROd 2500 APADJ 213 STEINY INSTALLATION OF TRAFFIC SIGNAL & LIGHTING SYSTEM AT MAIN & OWENS <br />PROd 2500 INSTALLATION OF A NEW TRAFFIC SIGNAL AT MAIN & O~ENS <br />PROd 2502 PROd 1442 IMPROVE SANTIAGO STREET FROH SANTA AMA TO WASHINGTON <br />PROd 2502 PROd 1442 GRIFFITH SANTIAGO STREET IMPROVEMENTS & TRAFFIC SIGNAL INSTALLATION $397,181 <br />PROd 2504 d R d CONSTRUCTION TRAFFIC SIGNAL INSTALLATION AT WARNER & YALE $55,895 <br />PROd 2506 SIGNAL CONSTRUCTION TRAFFIC SIGNAL AT GRAND & R55 $54,300 <br />PROd 2506 TRAFFIC SIGNAL INSTALLATION AT GRAND & 55 FREEWAY R~P <br />PROd 2508 LEFT HAND TURN LANE AT GRAND <br />PROd 2508A APADJ 068 VALLEY CREST LANDSCAPE GRAND AVENUE MEDIAN CONSTRUCTION $156,361 <br />PROd 2509 TRAFFIC SIGNAL AT DYER & TECH CENTER <br />PROd 2509A/2508B SULLY'MILLER CONSTRUCTION OF SIGNALS & MEDIANS ON DYER $213,370 <br />PROd 2511STEINY TRAFFIC SIGNAL INSTALLATION AT REDHILL & CARNEGIE $66,808 <br />PROd 2511 TRAFFIC SIGNAL INSTALLATION AT RED HILL & CARNEGIE <br />PROd 3042 PROd 3043 SEWER PROJECTS MYRTLE STREET BETWEEN BRISTOL & BAKER <br />PROd 3042 PROd 3043 d&J SEWER MAIN CONSTRUCTION AT MYRTLE, BAKER & CHESTNUT $190,619 <br />PROd 3043 PROd 3042 SEWER PROJECTS MYRTLE STREET BETWEEN BRISTOL & BAKER <br />PROd 3100 CONSTRUCTION & OEVELVOPMENT & TESTING OF WELL 33 917 W WALNUT <br />PROd 3100 MCALLA CONSTRUCTION DEVELOPMENT & TESTING OF WELL 33 $153,~6 <br />PROd 3106 AGMT 86'0[~ CH2M HILL PROFESSIONAL ENGINEERING SERVICES FOR A RECLAIMEO WATER STUDY <br /> <br />PROd 3106 RESO 85'131 SANTA WATER RECLAMATION PROJECT <br />PROd 3109 COAT INTERIOR OF ONE MILLION-OALLON ELEVATED TANK <br />PROd 3109 ROBISON'PREZIOSO INTERIOR COATING OF ONE MILLION GALLON WATER TANK $6~,~'32 <br />PROd 3116 REPAIR & WATERPROOFING OF ROOFS AT SOUTH RESERVOIR COt4PLEX <br />PROd 3116 SCHOLTEN ROOFING SERVICE REPAIR & WATERPROOFING OF ROOFS AT SOUTH RESERVOIR COMPLEX $218,725 <br />PROd 3504 TRAFFIC SIGNAL AT WARNER & YALE <br />PROd 5075 AGMT 85'018 MELAD INSPECTION SERVICES AT REGIONAL TRANSPORTATION CENTER <br />PROd 5075/82}'5 CHANGE ORDER 16 TRANSPORTATION CENTER INCREASE $211,554 <br />PROd 5075/8375 CHANGE ORDER 17 SANTA AMA/ORANGE COUNTY REGIONAL TRANSPORTATION CENTER INCREASE ~9,000 <br />PROd 5075/8375 CHANGE ORDER 18 SANTA ANA REGIONAL TRANSPORTATION CENTER INCREASE $16,'+,269 <br />PROd 5075/8375 CHANGE ORDER 19 SANTA AMA REGIONAL TRANSPORTATION CENTER INCREASE $29,915 <br />PROd 5075/8375 CHANGE ORDER 18 SANTA ARA REGIONAL TRANSPORTATION CENTER INCREASE $29,915 <br />PROd 5075/8375 CHANGE ORDER 19 SANTA AMA REGIONAL TRANSPORTATION CENTER TO 09/16/85 <br />PROd 5075/8375 CHANGE ORDER 19 SANTA AMA REGIONAL TRANSPORTATION CENTER TO 10/21/85 <br />PROd 5075/8375 CHANGE ORDER 19 SANTA ANA REGIONAL TRANSPORTATION CENTER IRCREASE $29,915 TO 11/04/85 <br />PROd 5075/8375 CHANGE ORDER l0 REGIONAL TRANSPORTATION CENTER INCREASE $78,806 <br />PROd 50~/8514 BAXTER'GRIFFIN COHPUTERIZED TRAFFIC SIGNALS $308,210 <br />PROd 50~S/8514HAZARD ELIMINATION SAFETY PROJECT: TRAFFIC SIGNAL MODIFICATIONS <br />PROd 50~/8512 HAZARD ELIMINATION SAFETY PROJECT LEFT TURN SIGNAL INSTALLATIONS <br />PROd 5088/8512 AGMT 85'149 STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION TESTING OF TRAFFIC SIGNAL CONTROLLER <br />PROd 5096 STREET LIGHT CONVERSION ON MAIN & EDINGER <br />PROd 5097/1431 PAUL GARDNER FIELD MODIFICATION <br />PROd 5098 MODIFICATION OF EXISTING STREET LIGHTING SYSTEMS ON MAIN & EDINGER <br />PROd 6075/8~75 AONT 85'067 RESO 85'069 AMEND STATE OF CALIFORNIA AGMT 65'573 REGIONAL TRANSPORTATION CENTER <br />PROd 6146 CONSTRUCTION OF NEW FIRE STATION 9 <br />PROd 6146 CONSTRUCTION OF NEW FIRE STATION 9 <br />PROd 6146 PROd 9253 FIRE STATION 9 REPLACEMENT <br />PROd 61~/7593 SANTA ANITA PARK RENOVATION <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.