My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55C - ALTON AVE OVERCROSSING @ SR 55
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
10/17/2005
>
55C - ALTON AVE OVERCROSSING @ SR 55
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:51:04 PM
Creation date
10/12/2005 12:34:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
55C
Date
10/17/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Draft Findings of Fact and Mitigation Monitoring Reporting Program (applies to CEQA only) <br /> <br />Rationale: Implementation of these standard industry practices will reduce impacts related to <br />seismic activity, liquefaction, expansive soils, and erosion to levels less than significant by <br />ensuring that all construction incorporate Best Management Practices for erosion control and <br />current Caltrans seismic design criteria. Standard industry practices also address liquefaction <br />and expansive soils issues. No other mitigation is required. <br /> <br />Reference: The discussion on setting, impacts, and mitigation related to Geology, Soils, and <br />Seismicity are included in Section 4.1 of the FEIR/EA prepared for the Alton Avenue <br />Overcrossing at SR-55. <br /> <br />7.2 HYDROLOGY, WATER QUALITY, STORMW ATER RUNOFF <br /> <br />Potentially Significant Effects <br /> <br />Permanent Impacts <br /> <br />. The receiving waters are presently subject to direct runoff from the existing highway, land <br />immediately adjacent to the highway, and adjacent residential, commercial, and industrial <br />urbanization. The proposed project is approximately 1,700 meters (5,577 feet) long, with an <br />average increase in pavement width of approximately 28.0 meters (92 feet), and an increase <br />in impervious area of 4.78 hectares (11.8 acres). The Preferred Alternative would increase <br />the rate and volume of runoff slightly. The rate and amount of any dissolvable and <br />suspended materials would increase slightly. The increased rate of runoff and volume of <br />runoff would be due to the increase in impervious surfaces. The overall watershed would <br />not change as a result ofthe project. <br /> <br />· Construction of the HOV direct-access drop ramps, with the associated widening of SR-55 <br />to accommodate the median ramps, would require the modification of the OCFCD Lane <br />Channel. Modifications would include replacing the channel with an enclosed box culvert <br />that would cross under the freeway to the east side of SR-55 where it would head south, <br />running parallel to the freeway under Pullman Street. The box culvert west of SR-55 would <br />be 10 feet high by 13 feet wide and east of SR-55 the box culvert would be shorter and <br />wider, 7 feet high and 12 feet wide, in order to accommodate the existing profile of Pullman <br />Street (double box culvert). These modifications would affect approximately 1,310 square <br />meters (2.36 acres). <br /> <br />Implementation of the Preferred Alternative would not significantly increase storm water <br />runoff volumes carried by Lane Channel and velocities of storm runoff after the project <br />would not vary significantly from the pre-project conditions. All new storm drain <br />improvements would be protected from any erosive velocities. <br /> <br />Temporary Impacts (Construction) <br /> <br />· Lane Channel would be relocated to cross under SR-55 just south of Dyer Road and <br />continue parallel to the freeway, under Pullman Street. <br /> <br />· During construction, the activities related to the Lane Channel relocation may have an <br />impact on the receiving waters. The potential impacts to receiving waters would be <br /> <br />Alton Avenue Overcrossing at SR-55 <br /> <br />K-IO <br /> <br />April July 2005 <br /> <br />55C-28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.