My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2005-10-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
10/17/2005
>
FULL PACKET_2005-10-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:50:54 PM
Creation date
10/12/2005 12:39:41 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Section 8. Refuse Collection Area. <br /> <br />Areas to handle the refuse for the development site shall be integrated into the <br />subterranean garage. At minimum, the project shall provide two refuse collection <br />areas measuring a minimum of 11' x 7'. Such collection areas shall be enclosed <br />and viewable with a durable material such as concrete block with metal doors. In <br />addition, each collection area shall provide a 'chute' to allow refuse from the <br />upper floors to collect within these areas. <br /> <br />Section 9. Telephone, Electrical, Water, Gas and Cable. <br /> <br />A. All "on-site" utilities shall be placed underground. <br /> <br />B. Transformers of terminal equipment shall be visually screened from view <br />from streets and adjacent properties. <br /> <br />C. There shall be no exposed downspouts, scupper drains, electrical or <br />mechanical limes on the building. All mechanical equipment shall be <br />screened from view in an architecturally integrated manner. <br /> <br />7 <br /> <br />11 A-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.