My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - 2701 N GRAND AVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
11/07/2005
>
75B - 2701 N GRAND AVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:50:36 PM
Creation date
11/2/2005 10:26:21 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
11/7/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />production. Therefore, implementation of the proposed <br />project would not result in adverse impacts to any <br />agriculture resources. <br /> <br />III. AIR QUALITY <br /> <br />A. Conflict with or obstruct implementation of applicable <br />Air Quality Attainment Plan or congestion Management <br />Plan? <br /> <br />Less Than Significant Impact <br /> <br />The project site is located within the South Coast Air <br />Basin and subject to the requirements of the Clear Air Act <br />at both the Federal and State level, as implemented by the <br />South Coast Air Quality Management District. The South <br />Coast Air Quality Management Plan (AQMP) is the primary <br />planning document to monitor if air quality standards and <br />objectives are being achieved in the South Coast Air Basin. <br />The air quality objectives in the AQMP are based upon <br />population and growth projections provided in regional <br />planning programs and local general plans. A project could <br />be in conflict with the AQMP if it results in population <br />and growth impacts beyond those identified in regional <br />planning programs and/or local general plans. <br /> <br />The proposed proj ect is consistent with the General Plan. <br />Implementation of the proposed project would not exceed the <br />population and traffic growth projections in the General <br />Plan. Therefore, the proposed proj ect would be considered <br />to be consistent with the regional and local growth <br />projections and would not be in conflict with the air <br />quality objectives established in the South Coast Air <br />Quality Management Plan. <br /> <br />B. Violate any stationary source air quality standard or <br />contribute to an existing or proposed air quality <br />violation? <br /> <br />D. Expose Sensitive receptors to substantial pollutant <br />concentrations? <br /> <br />Potentially Significant Unless Mitigation Incorporated <br /> <br />As mentioned previously, the South Coast Air Quality <br />Management District (SCAQMD) regulates air quality in the <br />South Coast Air Basin. The South Coast Air Basin is <br /> <br />5 <br /> <br />758-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.