Laserfiche WebLink
<br />OCTOBER 10, 2005 <br />PAGE70F8 <br /> <br />b. The Library shall be installed with attic baffles. All <br />operable windows shall have a rating of EWNR-32 or STC- <br />35. All fixed windows shall have a rating of EWNR-36 or <br />STC-40. All entry doors shall have a rating of EWNR-29 <br />or STC-32. <br /> <br />c. Bedroom 3 shall be installed with attic baffles. All <br />operable windows shall have a rating of EWNR-32 or STC- <br />35. All fixed windows shall have a rating of EWNR-36 or <br />STC-40. All entry doors shall have a rating of EWNR-29 <br />or STC-32. <br /> <br />37. The building plans for the Renaissance Plan 3 on Lots 11, 23, <br />and 26 shall reflect the following construction details: <br /> <br />a. <br /> <br />The Retreat shall be installed with attic baffles. <br />operable windows shall have a rating of EWNR-26 or <br />28. <br /> <br />All <br />STC- <br /> <br />b. Bedroom 2 shall be installed with attic baffles. All <br />operable windows shall have a rating of EWNR-32 or STC- <br />35. All fixed windows shall have a rating of EWNR-36 or <br />STC 40. All entry doors shall have a rating of EWNR-29 <br />or STC 32. <br /> <br />c. Bedroom 3 shall be installed with attic baffles. All <br />operable windows shall have a rating of EWNR-32 or STC- <br />35. All fixed windows shall have a rating of EWNR-36 or <br />STC 40. All entry doors shall have a rating of EWNR-29 <br />or STC 32. <br /> <br />38. <br /> <br />The building plans shall reflect <br />shall be provided for residential <br />Lots 6, 7, 8, 9, 10, 11, 12, 13, <br />24, 25, 26, 27, 28, 29 and 30. <br /> <br />that mechanical <br />units located on <br />14, 15, 19, 20, <br /> <br />ventilation <br />residential <br />21, 22, 23, <br /> <br />39. Prior to the recordation of final subdivision maps, a special <br />disclosure statement of the presence of the jet fuel line is <br />required to be provided on subdivision maps and deeds for the <br />project. <br /> <br />40. Prior to the building permit final for residential Lots 10, <br />11, 22, 23, 26 and 27, the project developer, at their sole <br />expense, shall conduct a noise monitoring analysis to ensure <br />that the residential units on such lots achieve an interior <br />noise level of 45 CNEL. <br /> <br />75C-109 <br />