My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - 2800 N FARMERS DR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
11/07/2005
>
75C - 2800 N FARMERS DR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:50:43 PM
Creation date
11/2/2005 11:19:38 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75C
Date
11/7/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SECTION 2.0 <br />CLARIFICATIONS TO DRAFT ENVIRONMENTAL IMPACT REPORT <br /> <br />The following is a list of clarifications to the Shea Homes Residential Project Draft <br />Environmental Impact Report. Those parts of the text that are underlined indicate <br />deletions and revisions to the Draft Environmental Impact Report. <br /> <br />Section 2.0, Table 2-1, Page 7 <br /> <br />The following mitigation measure has been revised. <br /> <br />Grading Plans and Building Plans for the proposed proj ect shall note that construction <br />activities on the project site shall take place between the hours of7:00 a.m. and 8:00 p.m. <br />Monday through Friday and 8:00 a.m. to 8:00 p.m. on Saturdavs and no construction <br />activity on Sundays or federal holidays. No construction equipment on the project site <br />shall operate including warming up until after 7:00 a.m. Monday through Friday and after <br />8:00 a.m. on Saturdavs. <br /> <br />Section 3.2 Proposed Project <br /> <br />During the public review period for the DEIR. the proiect developer has proposed a <br />modification to the proiect description. The third floor area of the homes originallv <br />proposed as attic storage space would now become habitable space. The third stOry area <br />would consist of approximatelv 580 square feet of area and have been designed to meet <br />the 45 dB CNEL interior noise standard. The construction materials for the third floor <br />area would depend on the location of the home. The third stOry area for the homes on <br />Lots 10.22. and 27 would be constructed with quiet rock panel exterior walls with a <br />minimum noise rating of ENWR 49 with an additional laver of quiet rock panel on the <br />ceiling assemblv. The northerlv facing windows along Interstate 5 would have a <br />minimum noise rating ofEWNR-45. <br /> <br />The third stOry area for the homes on Lots 12. 13. 16. 18.20.21. 24. 25. would be <br />constructed with exterior walls consisting of wood stud construction with stucco exteriors <br />and a minimum 1/2' inch gypsum drywall on the interior. All onhe exterior walls would <br />include fiberglass insulation in the stud cavities. The windows on the third floor area <br />would have a minimum noise rating of EWNR-22. The roof construction would <br />incorporate concrete or composition tiles on the exterior and a minimum y,-inch gypsum <br />drywall on the interior surface. <br /> <br />Attached are noise reduction calculations provided bv the proiect' s acoustical consultant. <br />Mestre Greve Associates. demonstrating that the proposed construction materi als for the <br />third floor area would be able to achieve the 45 dB CNEL noise standard. The <br />modification to the proiect description with the proposed construction practices would <br />not result in a new significant impact or substantiallv increase the severitv of <br />environmental impact associated with the proiect or result in the need for additional <br />mitigation measures. <br /> <br />75G,.31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.