My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - 2800 N FARMERS DR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
11/07/2005
>
75C - 2800 N FARMERS DR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:50:43 PM
Creation date
11/2/2005 11:19:38 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75C
Date
11/7/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Section 4.9 Hydrology/Water Quality <br /> <br />The following has been incorporated into the EIR to clarify the watershed characteristics <br />ofthe proj ect site. <br /> <br />The proiect site is located within the Lower Santa Ana River Watershed. The project site <br />consists of9.18-acres and was the former location of an office use and parking lot. The <br />project site has been recycled and is currently undeveloped. The majority ofthe proiect <br />site currentlv consists of pervious surfaces. The proiect site would be developed with <br />residential uses and would consist of more pervious surfaces than the former office use <br />on the project site. A total of 6.31-acres of the project site would consist of residential <br />lots, .91-acres would consist of open space and 1.96-acres would consist of roadways. <br /> <br />Section 5,3.5 Mitigation Measure N-1 <br /> <br />The following mitigation measure has been revised. <br /> <br />Grading Plans and Building Plans for the proposed proj ect shall note that construction <br />activities on the project site shall take place between the hours of7:00 a.ill. and 8:00 p.m. <br />Monday through Friday and 8:00 a.m. to 8:00 p.m. on Saturdavs and no construction <br />activity on Sundays or federal holidays. No construction equipment on the project site <br />shall operate including warming up until after 7:00 a.m. Monday through Friday and 8:00 <br />a.m. on Saturdays. <br /> <br />75~33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.