Laserfiche WebLink
<br />Control Best Management Practices in accordance with the Orange County Drainage <br />Area Management Plan. <br /> <br />Comment D3 <br /> <br />The submitted comment states that the construction phase of the project should include <br />compliance with the State General Construction Permit. <br /> <br />Mitigation Measure WQ-l on Page 23 of the DEIR requires the project developer to <br />show proof of coverage under the NPDES State General Construction Activity Storm <br />Water Permit and submittal of a Stonn Water Pollution Prevention Plan. <br /> <br />7 SCoT49 <br />