My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-107 - Environmental Impact Report for the Shea Homes Development Located at 2800 North Farmers Drive
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2005
>
2005-107 - Environmental Impact Report for the Shea Homes Development Located at 2800 North Farmers Drive
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:28:31 PM
Creation date
11/15/2005 12:44:16 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2005-107
Date
11/7/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Shea Homes Residential Project Findings and Facts in Support of Findings <br />Environmental Impact Report <br /> <br />. Bedroom 2 shall be installed with attic baffles. All operable windows shall have a rating <br />ofEWNR-32 or STC-35. All fixed windows shall have a rating ofEWNR-36 or STC 40. <br />All entry doors shall have a rating ofEWNR-29 or STC 32. <br /> <br />. Bedroom 3 shall be installed with attic baffles. All operable windows shall have a rating <br />ofEWNR-32 or STC-35. All fixed windows shall have a rating ofEWNR-36 or STC 40. <br />All entry doors shall have a rating ofEWNR-29 or STC 32. <br /> <br />N-8 The building plans shall reflect that mechanical ventilation shall be provided for <br />residential units located on residential Lots 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 19,20,21,22, <br />23,24,25,26,27,28,29,30. <br /> <br />N-9 Prior to the building permit final for residential lots 10, 11,12,22,23,26 and 27, the project <br />developer, at their sole expense, shall conduct a noise monitoring analysis to ensure that <br />the residential units on residential lots 10, 11,22,23,26 and 27 achieve an interior noise <br />level of 45 CNEL. <br /> <br />Level of Silmificance of lmDacts Related to Interior Living Area Noise lmoacts <br /> <br />The adverse impacts of the Shea Homes Residential Project related to air quality would be <br />reduced to a less than significant level with the implementation of Mitigation Measures N-5, N-6, <br />N-7, N-8 and N-9, provided above. <br /> <br />4.2.9 Impacts Related to Construction Noise Impacts <br /> <br />Potentiallv Significant Adverse Imoacts Related to Construction Noise Imoacts <br /> <br />Implementation of the proposed project would result in significant construction noise impacts, if <br />the project does not adhere to the City's Noise Ordinance. <br /> <br />Findings Related to Noise lmDacts to Construction Noise ImDacts <br /> <br />Mitigation measures have been incorporated into the project, which avoid or substantially lessen the <br />project impacts identified in the ElR. <br /> <br />Facts in SUDport of the Finding Related to Construction Noise lmDacts <br /> <br />Implementation of Mitigation Measures N-l, N-2, and N-3, provided below, would substantially <br />lessen the adverse impacts of the Shea Homes Residential Project related to construction noise <br />impacts. <br /> <br />N-l Grading Plans and Building Plans for the proposed project shall note that construction <br />activities on the project site shall take place between the hours of 7:00 a.m. and 8:00 p.m. <br />Monday through Friday and 8:00 a.m. to 8:00 p.m. on Saturdays and no construction <br />activity on Sundays or federal holidays. No construction equipment on the project site <br /> <br />Resolution No. 2005-107 <br />Page 26 of 38 <br /> <br />Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.