Laserfiche WebLink
<br />fixed windows shall have a rating of EWNR-36 or STC 40. <br />All entry doors shall have a rating of EWNR-29 or STC 32. <br /> <br />c. Bedroom 3 shall be installed with attic baffles. All operable <br />windows shall have a rating of EWNR-32 or STC-35. All <br />fixed windows shall have a rating of EWNR-36 or STC 40. <br />All entry doors shall have a rating of EWNR-29 or STC 32. <br /> <br />38. The building plans shall reflect that mechanical ventilation shall be <br />provided for residential units located on residential Lots 6, 7, 8, 9, <br />10,11,12,13,14,15,19,20,21,22,23,24,25,26,27,28,29and <br />30. <br /> <br />39. Prior to the recordation of final subdivision maps, a special <br />disclosure statement of the presence of the jet fuel line is required <br />to be provided on subdivision maps and deeds for the project. <br /> <br />40. Prior to the building permit final for residential Lots 10, 11, 22, 23, <br />26 and 27, the project developer, at their sole expense, shall <br />conduct a noise monitoring analysis to ensure that the residential <br />units on such lots achieve an interior noise level of 45 CNEL. <br /> <br />41. Prior to the building permit final, a disclosure statement on the risks <br />and potential exposure to Particulate Diesel Matter shall be <br />provided on all final subdivision maps and grant deeds for the <br />project. <br /> <br />42. In the event unknown cultural resources are encountered, all <br />earthwork activities in the area of the finding shall halt and the City <br />of Santa Ana Environmental Coordinator shall be contacted for <br />appropriate action. <br /> <br />43. During construction operations near the jet fuel pipeline, a <br />representative from the Department of Defense shall be present to <br />monitor construction activities to ensure that no damage occurs to <br />the jet fuel pipeline. <br /> <br />44. Prior to commencement of construction activities, the project <br />developer shall identify to the City a construction relation officer to <br />act as a community liaison concerning onsite construction activity <br />impacts. The name and phone number of the construction relation <br />officer shall be posted on the project site. <br /> <br />45. Prior to the issuance of Building Permits, the applicant shall submit <br />revised elevations showing balustrades and windows consistent <br />with the architectural vocabulary of the main elevation. <br /> <br />Resolution No. 2005-108 <br />Page 11 of 11 <br />