Laserfiche WebLink
<br />excessive amounts 0= <br />dus t . IiJa ter ing wi th <br />complete coverage <br />shall occur at least <br />twice daily, once lD <br />the late morning and <br />once after work lS <br />done for the day. <br /> <br />AI] clearing and <br />earthwork activities <br />shall cease during <br />period of high winds <br />(winds greater than <br />25 mph averaged over <br />one hour) or during <br />Stage 1 or Stage 2 <br />smog episodes_ <br /> <br />Streets surrounding <br />the project site <br />should be cleaned at <br />the end of each day <br />of construction. <br /> <br />All material <br />transported offsite <br />shall either be <br />sufficiently wa~ered <br />or securely covered <br />to prevent excessive <br />amounts of dust. <br /> <br />The amount of area <br />disturbed by <br />clearing and <br />earthwork activities <br />shall be minimized <br />at all times. <br /> <br />Equipment engines <br />shall be maintained <br />in good condition <br />and in proper tune <br />according to <br />manufacturer's <br />specifications_ <br /> <br />To the extenL <br />feasible, gasoline <br />powered equipment <br /> <br />7~~-77 <br />