Laserfiche WebLink
<br />required, prior to <br />the lssuance or <br />grading perroi ts, the <br />applicant shall <br />provj de proof to the <br />City of an NPDES <br />permit rrom the <br />Regional Water <br />Quality Control <br />Board for onsi te <br />dewatering <br />operations. <br /> <br />Prior to issuance of <br />a grading permit, <br />the project <br />applicant shall <br />submit a final <br />surface water runoff <br />evaluation for <br />review and approval <br />showing existing and <br />proposed racilities <br />and methods of <br />draining the site <br />without exceeding <br />the capaci ty of any <br />street or adjacent <br />storm drain <br />racility. <br /> <br />Building Plans shall <br />reflect that Sound- <br />Rated windows with a <br />Sound Transmission <br />Class (STC) of 30 or <br />greater shall be <br />installed on all <br />windows for the <br />southern building <br />fa<;:ade fronting <br />Edinger Avenue. <br /> <br />Building Plans shall <br />reflect that Sound- <br />Rated windows with a <br />Sound transmission <br />Class (STCI of 28 or <br />greater shall be <br />installed on all <br />windows ror the <br /> <br />Prior to <br />Grading Permit <br /> <br />Prior to <br />Building <br />Permits <br /> <br />Prior to <br />Building <br />Permits <br /> <br />7 9J~o-82 <br /> <br />Public Works <br />Agency <br /> <br />Planning/ <br />Building <br />Agency <br /> <br />Planning/ <br />Building <br />Agency <br />