Laserfiche WebLink
<br />REQUEST FOR <br />Planning Commission Action <br /> <br />~ <br />~ <br /> <br />PLANNING COMMISSION SECRETARY <br /> <br />PLANNING COMMISSION MEETING DATE: <br />NOVEMBER 14, 2005 <br /> <br />TITLE: <br />PUBLIC HEARING - FILED BY STARBRIDGE <br />COMMUNICATIONS FOR CONDITIONAL USE <br />PERMIT NO. 2005-24 TO CONSTRUCT A <br />60-FOOT HIGH CELLULAR ANTENNA AT <br />1316~ EAST WARNER AVENUE <br /> <br />APPROVED <br />o As Recommended <br />o As Amended <br />o Set Public Hearing For <br />DENIED <br /> <br />o Applicant's Request <br />o Staff Recommendation <br /> <br />CONTINUED TO <br /> <br />Prepared by Marvin Ellenbecker <br /> <br />~ <br />lYxecutive Director <br /> <br />1~~p~F <br /> <br />RECOMMENDED ACTION <br /> <br />Adopt a resolution approving Conditional Use Permit No. 2005-24 as <br />conditioned. <br /> <br />DISCUSSION <br /> <br />Request of Applicant <br /> <br />Starbridge Communications, representing Sprint PCS, <br />approval of a conditional use permit to construct <br />cellular antenna at 1315% East Warner Avenue. <br /> <br />is requesting <br />a 60-foot tall <br /> <br />Property Description <br /> <br />The property is located within the Light Industrial (M-l) zoning district <br />and has a General Plan land use designation of Industrial (IND) <br />(Exhibit 1). The property is bounded by industrial uses to the north, <br />south, east and west (Exhibit 2). The subj ect property, known as the <br />Johanna Substation, is approximately 16.7 acres in size, rectangular in <br />shape and improved with a utility substation, utility transmission lines, <br />and recreational vehicle storage. <br /> <br />Project Description <br /> <br />Sprint PCS currently leases 576 square feet near the entrance to the <br />Southern California Edison Johanna Substation property for an existing 35- <br />foot wireless facility and equipment cabinets. The current facility is <br />not camouflaged and has an array of three antennas at the top. No changes <br />are proposed for the existing equipment cabinets and landscaping <br />(Exhibit 3). Sprint is proposing to remove the 35-foot wireless facility <br />and replace it with a 50-foot high wireless facility monopole. <br /> <br />EXHIBIT A <br />31A-2 <br />