My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
80A - SAINT JOSEPH BALLET
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
12/19/2005
>
80A - SAINT JOSEPH BALLET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:49:35 PM
Creation date
12/14/2005 10:15:27 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
80A
Date
12/19/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DECEMBER 12, 2005 <br />PAGE 1 OF 1 <br /> <br />Conditions for Approval <br /> <br />Should modification to Variance No. 1998-06 be approved, the project shall <br />comply with all applicable sections of the Santa Ana Municipal Code, the <br />California Administrative Code, the Uniform Fire Code, the Uniform <br />Building Code and all other applicable regulations. In addition, it shall <br />meet the following conditions: <br /> <br />The applicant must comply in full with each and every condition listed <br />below prior to exercising the rights conferred by this variance. <br /> <br />The applicant must remain in compliance with all conditions listed below <br />throughout the life of the variance. Failure to comply with each and <br />every condition may result in the revocation of the variance. <br /> <br />A. Planning Division <br /> <br />1. Compliance with DP No. 97-61 Site Plan Review comments with <br />the exception of the items covered by the variance. <br /> <br />2. A parking plan needs to be submitted that identifies <br />additional parking facilities that will be used during those <br />days that events between the ballet studio, Bower's Museum and <br />the Kidseum are held simultaneously. <br /> <br />3. In the event the KidoeUFR or I3o.y;er' 0 P1uoeum South Lot p.:lrking <br />f.:lcilitieo .:lre rem07ed, repl.:lccment p.:lrking f.:lcilitieo ffiUOt be <br />loc.:lted on .:l oite ..Jithin 300 feet of the Ct. Jooeph I3.:lllet <br />p.:lrcel. <br /> <br />4. Any changes to the building elevations, including materials <br />and colors, must be submitted to staff for review. <br /> <br />5. The crushing of any demolition materials will not be permitted <br />on the site. All construction debris must be removed from the <br />premises within five working days. <br /> <br />B. Police Department <br /> <br />1. The alcove created by the patio on the north perimeter of the <br />proj ect needs to be fenced off with materials acceptable to <br />the Planning Division and Police Department. <br /> <br />2. The existing parking lot immediately west of the studio, the <br />student drop-off area, and the entrances to the facility <br />located at each gate and on the north perimeter must be <br />illuminated to a minimum maintained one footcandle of light. <br />80A+ti31r 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.