Laserfiche WebLink
<br />coordinate with the <br />utility company to <br />determine the <br />presence of PCBs in <br />the transforms along <br />the project site. In <br />the event PCBs are <br />present the <br />applicant shall <br />coordinate with the <br />utility company on <br />the removal of the <br />transformers. <br /> <br />Prior to the <br />issuance of grading <br />permits, the <br />applicant shall <br />submit and have <br />approved a surface <br />drainage/utility <br />plan that depicts <br />all applicable Site <br />Design Structural <br />Source Control and <br />Treatment Control <br />Best Management <br />Practices in <br />accordance with the <br />Orange COUIlty <br />Drainage Area <br />Management Plan and <br />the City of Santa <br />Ana local <br />Implementation Plan. <br /> <br />Prove two copies of <br />the Water Quality <br />Management Plan that <br />include the <br />following: <br /> <br />Site Assessment <br /> <br />Site design BMPs <br /> <br />Applicable Routine <br />Source Control BMps <br />Electing and sizing <br />the Treatment <br />Control Blvl:Ps <br /> <br />Resolution No. 2005-114 <br />Page 22 of 31 <br /> <br />Prior to <br />Grading <br />Permits <br /> <br />Prior to <br />Grading <br />Permits <br /> <br />5 of 10 <br /> <br />Public Works <br />Agency <br /> <br />Public Works <br />Agency <br />