Laserfiche WebLink
Attachment A <br />CITY OF SANTA ANA <br />CONSTRUCTION AND DEMOLITION RATES <br />JULY 1, 200S <br />Service <br />Maximum Hauling <br />Host Fee <br />Maximum Rates With <br />and Processing Rate <br />12.8% Surcharge <br />Roll -off containers <br />$386.00 <br />$21.00 <br />$466.74 <br />- mixed C and D <br />Up to 7 tons/4 <br />days <br />Roll -off containers <br />To be determined by <br />Actual Rate Charged plus <br />- end user loads <br />CONTRACTOR <br />12.8% of gross receipts <br />Per ton over 7 <br />$38.20 per ton <br />$3 per ton <br />$47.25 per ton <br />Days 5-14 <br />$5 <br />$5.73 <br />3 yard bin <br />$92.24 <br />$105.78 <br />Up to .5 tons/14 <br />days <br />Cancellation fee <br />50 <br />$57.34 <br />Trip/relocation fee <br />50 <br />$57.34 <br />Graffiti removal <br />$25 <br />$28.67 <br />Hard to handle <br />$10 <br />$11.47 <br />loadsper ton* <br />*May only be charged to Customers if actually charged to Contractor by Madison Materials. <br />Hard to handle loads include loads that contain 50% or more of the following: <br />• Items over 20 feet in length or 3 feet in diameter, including large chunks of <br />concrete, boulders, inert materials mixed with rebar, and tree stumps <br />• Appliances <br />• Fine dust, such as sawdust and marble powder <br />• Tires <br />• Universal or E-wastes <br />20 <br />