My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WARE DISPOSAL 2- A-2005-242
Clerk
>
Contracts / Agreements
>
TRASH CONTRACTS & MISC. FRANCHISE AGREEMENTS
>
TRASH / SOLID WASTE COLLECTION
>
WARE DISPOSAL
>
WARE DISPOSAL 2- A-2005-242
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 3:16:43 PM
Creation date
12/21/2005 12:59:56 PM
Metadata
Fields
Template:
Contracts
Company Name
WARE DISPOSAL
Contract #
A-2005-242
Agency
Public Works
Council Approval Date
10/3/2005
Expiration Date
6/30/2008
Insurance Exp Date
8/1/2021
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to a Construction and Demolition Debris Processing Facility, or to <br />an End User. <br />k. Recycline means collecting, sorting, cleansing, treating, <br />processing and reconstituting recyclable solid wastes for the <br />purpose of reuse. <br />I. Santa Ana Customers means one or more customers of the <br />Madison Materials Facility that meet all of the following criteria: <br />(1) the customer is an entity that holds a Non -Exclusive Hauling <br />Agreement with the City of Santa Ana; and (2) the customer is <br />depositing C&D Debris or Incidental Wastes generated at <br />Temporary Construction Sites in the City of Santa Ana at the <br />Madison Materials Facility for processing. <br />m. Temporary Construction Site means a location upon which <br />temporary construction activities are occurring, including without <br />limitation, construction, remodeling, repair, demolition, site <br />preparation or grading occurring at or on streets, houses, <br />commercial buildings, and other structures or sites. <br />n. Willing and Able to Accept C&D Debris means that Madison <br />Materials will accept all C&D Debris and Incidental Waste <br />delivered by each Santa Ana Customer until daily capacity is met <br />or until 6 p.m. whichever occurs first. Madison Materials must <br />process all deliveries, determine the gross weight, receive, inspect, <br />provide for the unloading of C&D Debris and Incidental Waste, <br />and determine the tare weight of all delivered loads on a first -come <br />first -served basis. Fifteen minutes after arrival at the Madison <br />Materials Facility, all Santa Ana Customers will be given priority <br />over all of Madison Material's other customers, in the order of <br />their arrival. <br />CONTRACTOR shall have the right to operate anywhere within the City limits. <br />El <br />
The URL can be used to link to this page
Your browser does not support the video tag.