Laserfiche WebLink
DATE: 10/laW <br />ESTIMATE OF MATERIAL AND FORCE ACCOUNT WORK <br />BY THE <br />UNION PACIFIC RAILROAD <br />DESCRIPTION OF WORK <br />LOS NIETOS (SANTA ANA) SUB I MP 519.10I WARNER AVE I SANTA ANA, CALIF. <br />PROPOSE TO PARTICIPATE WITH THE CITY OF SANTA ANA IN IMPROVING THE <br />PUBLIC CROSSING AT WARNER AVE. IN SANTA ANA, CALIF. <br />PID: 41221 AWO: 04806 MP, SUB DIV. 519.10, SANTA ANA <br />SERVICE UNIT: 20 CITY: SANTA ANA STATE: CA <br />DESCRIPTION QTY UNIT <br />LABOR <br />MATERIAL <br />RECOLL <br />UPRR <br />TOTAL <br />ENGINEERING WORK <br />ENGINEERING <br />2329 <br />2329 <br />2329 <br />TOTAL ENGINEERING <br />2329 <br />2329 <br />2329 <br />SIGNAL WORK <br />MATL STORE EXPENSE <br />11 <br />11 <br />11 <br />SALES TAX <br />g <br />8 <br />g <br />SIGNAL <br />220 <br />220 <br />220 <br />TOTAL SIGNAL <br />0 <br />239 <br />239 <br />239 <br />TRACK& SURFACE WORK <br />CITY OF SANTA ANA (FIXED RATE) <br />35829 <br />35829 <br />35829 <br />BALLAST 4 CL <br />1508 <br />1508 <br />1508 <br />DISPOSAL FEE <br />720 <br />720 <br />720 <br />EQUIP RENT <br />5760 <br />5760 <br />5760 <br />FIELD WELD <br />116 <br />116 <br />116 <br />FOREIGN LINE FREIGHT <br />1440 <br />1440 <br />1440 <br />LABOR ADDITIVE <br />34872 <br />34872 <br />34872 <br />MATL STORE EXPENSE <br />1225 <br />1225 <br />1225 <br />OTM <br />1051 <br />4339 <br />5390 <br />5390 <br />PER DIEM <br />17125 <br />17125 <br />17125 <br />RAIL 640 LF <br />1426 <br />3954 <br />5380 <br />5380 <br />RDKING 200 TF <br />6202 <br />19355 <br />25557 <br />25557 <br />SALES TAX <br />1420 <br />1420 <br />1420 <br />SIG GENERAL <br />I <br />1125 <br />1125 <br />TRK-SURF,LIN <br />3660 <br />3660 <br />3660 <br />WELD <br />1652 <br />890 <br />2542 <br />2542 <br />XTIE 200.00 EA <br />6915 <br />5523 <br />14438 <br />14438 <br />TOTAL TRACK & SURFACE <br />59019 <br />99068 <br />35829 <br />122278 <br />158107 <br />LABOR/MATERIAL EXPENSE <br />613 88 <br />99327 <br />RECOLLECTIBLEIUPRR EXPENSE <br />124846 <br />ESTIMATED PROJECT COST <br />35829 <br />EXISTING REUSEABLE MATERIAL CREDIT <br />0 <br />SALVAGE NONUSEABLE MATERIAL CREDIT <br />0 <br />RECOLLECTIBLE LESS CREDITS <br />160675 <br />THE ABOVE FIGURES ARE ESTIMATES ONLY AND SUBJECT TO FLUCTUATION. IN THE EVENT OF <br />AN INCREASE OR DECREASE IN THE COST OR QUANTITY OF MATERIAL OR LABOR REQUIRED, <br />UPRR WILL BILL FOR ACTUAL CONSTRUCTION COSTS AT THE CURRENT EFFECTIVE RATE. <br />