My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
80A - LOAN AGMTS ROSS & DURANT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
01/03/2006
>
80A - LOAN AGMTS ROSS & DURANT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:49:20 PM
Creation date
12/28/2005 11:47:29 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
80A
Date
1/3/2006
Destruction Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Relocation Plan for the OHDC 1501 North Ross Street Rehabilitation Project <br /> <br />C. PROJECT DESCRIPTION <br /> <br />The Project involves the rehabilitation of 1501 North Ross Street. Currently the property is <br />made up of studio apartments which will be converted into affordable 1- & 2-bedroom <br />apartments. Additionally, interior rehabilitation activities will include replacement of major <br />kitchen appliances, new paint and bathroom enhancements as well as replacement offloor <br />coverings, doors and windows. Exterior improvements will include the addition, repair or <br />replacement of roofs, staircases, balconies, landscaping, water heaters, decking, trash <br />enclosures, parking lots and building facades. <br /> <br />The property at 1501 North Ross Street currently has 30 studio units. The proposed <br />rehabilitation will create 13 one-bedroom and 11 two-bedroom apartment units. The <br />property will have a mix of affordability levels based on area median income (AMI) levels <br />determined by HUD, from levels between 40% - 60%. The proposed affordability levels for <br />the Ross property are shown in Table 2, below: <br /> <br />Table 2: Proposed Property Unit Mix by Affordability Levels <br />Unit Type 40% AM I 50% AM I 60% AM I Total <br /> ROSS <br />One Bedroom 2 11 13 <br />Two Bedroom 1 4 6 11 <br />Three Bedroom 0 <br />Total 3 15 6 24 <br /> <br />The Developer is proposing to undertake all needed improvements to the individual units, <br />up to 6 units at a time. The rehabilitation and construction cycle will last between three <br />weeks to one month per unit and the construction is expected to begin immediately <br />following the Agency approval in June 2006. <br /> <br />As a result of the rehabilitation, residents will be required to move either temporarily or <br />permanently from their units. Upon completion of the rehabilitation, residents who meet <br />qualifying occupancy and income standards will be able to return to a rehabilitated unit. <br />Those households which do not meet qualifying occupancy and income standards, will be <br /> <br />Prepared by Overland, Pacific & Cutler, Inc. <br /> <br />Page 5 <br /> <br />80A-15 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.