Laserfiche WebLink
<br />EXHIBIT A <br /> <br />Advanced Transportation Concepts Group <br />14 Sorenson, Irvine, CA 92602 <br /> <br />August 22, 2005 <br /> <br />Mr. T.C. Sutaria <br />City Traffic Engineer <br />~ City of Santa Ana <br />Public Works Department <br />20 Civic Center Plaza <br />Santa Ana, CA 92702 <br /> <br />Re: On-Call Consulting Services for the Design and Integration of the MIST <br />System <br /> <br />Dear Mr. Sutaria: <br /> <br />Thank you for this opportunity to submit a proposal to assist the City of Santa Ana with <br />ITS integration as the City's on-call ITS design and integration firm. The City has <br />embarked on an exciting project to design and implement a MIST system integrated <br />with the Model 2070 Advanced Transportation Controllers (ATCs). This project is very <br />critical to the City for at least several reasons: <br />1. To provide the City a migration path out of the existing VMS system with a <br />system capable of adaptive control, <br />2. To update the City with national standard 2070 A TC controllers, and <br />3. To give the City an opportunity to update its traffic system infrastructure. <br /> <br />We believe the City has reached a fork in the road such that every step you take will <br />affect the outcome of this project and each decision that you make will greatly impact <br />the City well beyond the scope of this project, for years to come. Advanced <br />Transportation Concepts Group (ATCG) has the expertise to guide and assist you with <br />the following challenges: <br />1. Review of the original project scope of work and consultant agreements. <br />2. Review and inventory of City infrastructure. <br />3. Design and test communications infrastructure, <br />4. Design 2070 integration with City's existing NEMA-based traffic signal cabinets <br />and transition to 332-type traffic signal cabinets. <br />5. Assist with testing and integrating MIST as the City's central system, <br />6. Assist with testing and integrating 2070 traffic control firmware, and <br />7. Documenting project results and findings for City's future reference. <br /> <br />8 <br />