My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENVIRONMENTAL ENGINEERING 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
E-F (INACTIVE)
>
ENVIRONMENTAL ENGINEERING 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 4:52:33 PM
Creation date
1/9/2006 10:32:07 AM
Metadata
Fields
Template:
Contracts
Company Name
Environmental Engineering and Contracting, Inc.
Contract #
A-2005-285
Agency
Public Works
Council Approval Date
12/5/2005
Expiration Date
12/31/2007
Insurance Exp Date
10/31/2007
Destruction Year
2016
Notes
Amended by A-2005-285-01
Document Relationships
ENVIRONMENTAL ENGINEERING 2A
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\E-F (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
inspections shall be provided on an as -needed basis and shall be billed at the rates shown on <br />attached Exhibit B-1. <br />It is currently anticipated that the Orange County Health Care Agency will begin providing some <br />type of basic kitchen BMP inspections during 2006. Additionally, City inspectors are being trained <br />to provide each of the various categories of inspections. EEC shall coordinate these efforts and <br />adjust the inspection intervals to account for these additional efforts, <br />TASK 2 — Trainingof f City Staff <br />EEC will train City Public Works Agency Sanitation Inspectors to conduct all of the categories of <br />FSE inspections. Training will include classroom style training at EEC's office as well as ride - <br />along training to assess level of competency. When City staff are fully trained, they will perform <br />some of the on-going inspections. <br />TASK 3 — FOG Control Program Management <br />1) EEC will utilize the updated FSE database to organize, integrate and manage the FOG control <br />data. EEC will evaluate and summarize the data, and report the findings and recommendations <br />to the FOG Control Program Manager on a monthly basis. EEC will coordinate activities <br />associated with the Hot Spot characterization database maintained by the City. <br />2) EEC will coordinate the activities of City, inspectors to integrate their activities into the overall <br />program. EEC will furnish the City with monthly schedules for inspections so that City staff <br />can develop work plans. EEC will provide inspection forms for use by City Staff and will enter <br />data collected by City Staff into the database. <br />3) EEC will conduct periodic meetings with City staff to integrate sewer system and source control <br />data and prioritize required activities. <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.