My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENVIRONMENTAL ENGINEERING 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
E-F (INACTIVE)
>
ENVIRONMENTAL ENGINEERING 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 4:52:33 PM
Creation date
1/9/2006 10:32:07 AM
Metadata
Fields
Template:
Contracts
Company Name
Environmental Engineering and Contracting, Inc.
Contract #
A-2005-285
Agency
Public Works
Council Approval Date
12/5/2005
Expiration Date
12/31/2007
Insurance Exp Date
10/31/2007
Destruction Year
2016
Notes
Amended by A-2005-285-01
Document Relationships
ENVIRONMENTAL ENGINEERING 2A
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\E-F (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B-2 <br />2006 Fee Schedule <br />PERSONNEL CHARGES — The charge for all time required for the performance of the Scope of Services, <br />including office, field and travel time, will be billed at the hourly rate according to the labor classifications set forth <br />below: <br />Labor Classification Hourly Rate <br />Staff Geologist, Engineer, Scientist <br />$85 <br />Sr Staff Geologist, Engineer, Scientist <br />$95 <br />Project Manager, Geologist, Engineer - 1 <br />$110 <br />Project Manager, Geologist, Engineer — It <br />$120 <br />Sr Project Manager, Geologist, Engineer - 1 <br />$140 <br />Sr Project Manager, Geologist, Engineer - 11 <br />$165 <br />Principal Geologist, Engineer <br />$175 <br />Principal <br />$195 <br />Project Assistant <br />$65 <br />Technician <br />$75 <br />Drafter <br />$80 <br />Sr Technician <br />$85 <br />Compliance Inspector <br />$85 <br />GIS Analyst <br />$85 <br />GIS, Database Specialist <br />$110 <br />Construction Technician <br />$60 <br />Construction Field Supervisor <br />$70 <br />Construction Manager <br />$80 <br />Sr Construction Manager <br />$110 <br />Emergency response and client requested work during non-standard business hours will be charged at a rate of 1.25 <br />times the standard hourly rate. <br />When EEC Staff appear as expert witnesses at court trials, mediation, arbitration hearings and depositions, their time <br />will be charged at 2.0 times the standard rate. All time spent preparing for such trials, hearings, and depositions, will <br />be charged at the standard hourly rate. <br />TRAVEL. Field vehicles used on project assignments will be charged at $50 per day. The mileage charge will be <br />billed by the current rate established by the Internal Revenue Service plus mark up. Per Diem is billed at a unit cost of <br />$40 per day. Lodging and Per Diem is billed at $175 per day. <br />FIELD EQUIPMENT. Field Equipment is billed at standard unit costs. Rate schedules are available upon request. <br />SUBCONTRACTORS AND REIMBURSABLES. The costs of subcontractors, materials, equipment rental and costs <br />incurred will be charged at cost plus 15%. <br />OTHER PROJECT CHARGES. The cost of additional report reproduction and special project accounting will be billed <br />as appropriate. Plotting plans are charged by size, black and white or color, and by the number of copies supplied. <br />SHIPPING AND POSTAGE. Shipping charges include couriers and the postage necessary will be charged at cost <br />plus markup. <br />INTEREST CHARGES, Interest on late payments will be charged at the rate of 1.5% per month. <br />This Fee Schedule is adjusted each subsequent year to reflect the economic changes Por the new year The new schedule will apply to existing <br />and new assignments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.