My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-122 - Parking for the Saint Joseph Ballet Studio Located at 1818 North Main Street
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2005
>
2005-122 - Parking for the Saint Joseph Ballet Studio Located at 1818 North Main Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:28:37 PM
Creation date
1/10/2006 7:54:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2005-122
Date
12/19/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Amendment to Conditions for Approval for Variance No. 1998-06 <br /> <br />Amendment of Variance No. 1998-06 is hereby approved. The project shall comply with <br />all applicable sections of the Santa Ana Municipal Code, the California Administrative <br />Code, the Uniform Fire Code, the Uniform Building Code and all other applicable <br />regulations. In addition, it shall meet the following conditions: <br /> <br />The applicant must comply in full with each and every condition listed below prior to <br />exercising the rights conferred by this variance. <br /> <br />The applicant must remain in compliance with all conditions listed below throughout the <br />life of the variance. Failure to comply with each and every condition may result in the <br />revocation of the variance. <br /> <br />A. Plannina Division <br /> <br />1. Compliance with DP No. 97-61 Site Plan Review comments with the <br />exception of the items covered by the variance. <br /> <br />2. A parking plan needs to be submitted that identifies additional parking <br />facilities that will be used during those days that events between the ballet <br />studio, Bower's Museum and the Kidseum are held simultaneously. <br /> <br />3, In the event the Kidseum or Bower's Museum South Lot parking facilities <br />aro removed, replacement parking facilities must be located on Ll site <br />within 300 f-eet of the St. Joseph Ballet parcel. <br /> <br />4. Any changes to the building elevations, including materials and colors, <br />must be submitted to staff for review. <br /> <br />5. The crushing .of any demolition materials will not be permitted on the site. <br />All construction debris must be removed from the premises within five <br />working days. <br /> <br />B. Police Department <br /> <br />1. The alcove created by the patio on the north perimeter of the project <br />needs to be fenced off with materials acceptable to the Planning Division <br />and Police Department. <br /> <br />2. The existing parking lot immediately west of the studio, the student drop- <br />off area, and the entrances to the facility located at each gate and on the <br />north perimeter must be illuminated to a minimum maintained one <br />footcandle of light. <br /> <br />Exhibit A <br /> <br />Resolution No. 2005-122 <br />Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.