My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - REFUSE COLLECTION/RECYCLING SOLID WASTE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
01/17/2006
>
25A - REFUSE COLLECTION/RECYCLING SOLID WASTE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:49:03 PM
Creation date
1/10/2006 4:33:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25A
Date
1/17/2006
Destruction Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />7.2 Lift and Dump Test - shall verify the cart's compatibility with approved, <br />commercially available, standard dumping equipment. Test shall be performed at <br />room temperature with a cycle time that simulates lift, dump and return of 6 <br />seconds. Carts shall remain watertight and functional beyond 6,000 cycles. Test <br />loads are as follows: <br /> <br />Size A: <br />Size B: <br />Size C: <br /> <br />160 lbs. distributed <br />250 lbs. distributed <br />350 lbs. distributed <br /> <br />7.3 Wheel! Axle Test - shall verify the combined durability of the wheels, axle and cart <br />axle supports under fully loaded conditions. The two cycle tests shall be performed <br />at room temperature as follows: <br /> <br />Cycle 1 - with a rolling length of 75 feet and a 5" curb drop. Cart shall continue to <br />roll freely and be watertight after 1,000 drops. <br /> <br />Cycle 2 - repeated with a 5.5" stair drop. Cart shall continue to roll freely and be <br />watertight after 1,000 drops. <br /> <br />Test loads shall be as follows: <br /> <br />Size A: <br />Size B: <br />Size C: <br /> <br />125 lbs. distributed <br />200 lbs. distributed <br />350 lbs. distributed <br /> <br />7.4 Salt Spray - ASTM B 117 -90 corrosion tests shall be applied to the lift bracket for a <br />minimum of 96 hours and to the axle for a minimum of 500 hours. Bracket and axle <br />shall remain corrosion free. <br /> <br />8. Serial NumberlManufacture Date: Each cart shall be hot stamped with a seven digit, 1-W' <br />high alpha/numeric identification number on the front ofthe cart. An in-molded year/month <br />date wheel identification will be located on the bottom ofthe cart. <br /> <br />9. Markings: Each cart lid shall be clearly and permanently marked with the cart's size or <br />volume capacity. <br /> <br />9.1 Precautionary instructions shall be molded into the lids in English and Spanish as <br />follows: <br /> <br />Size A: <br /> <br />Cart Capacity 35 Gallons <br />Do not overload or you may have difficulty controlling the cart. <br />Do not roll cart with lid open. <br />Do not put sand, soil, rocks or concrete in cart. <br />Maximum load 125 pounds. <br />Do not put anything hot such as ashes in the cart. <br /> <br />25A-46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.