My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2006-01-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
01/17/2006
>
FULL PACKET_2006-01-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:48:59 PM
Creation date
1/11/2006 12:18:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />REQUEST FOR <br />COUNCIL ACTION <br /> <br />~ <br />~ <br /> <br />CITY COUNCIL MEETING DATE: <br /> <br />CLERK OF COUNCIL USE ONLY: <br /> <br />JANUARY 17, 2006 <br />TITLE: <br /> <br />APPROVED <br /> <br />CONTRACT AWARD FOR SEISMIC <br />RETROFIT OF FAIRVIEW STREET <br />BRIDGE OVER THE SANTA ANA <br />RIVER (PROJECT NO. 1825) <br /> <br />o As Recommended <br />o As Amended <br />o Ordinance on 1 sl Reading <br />o Ordinance on 2nd Reading <br />o Implementing Resolution <br />o Set Public Hearing For <br /> <br /> <br />CONTINUED TO <br /> <br />FILE NUMBER <br /> <br />RECOMMENDED ACTION <br /> <br />1. Award a contract to Powell Constructors, the lowest responsible <br />bidder, in accordance with unit bid prices in the estimated amount of <br />$1,363,322.50 for construction of Seismic Retrofit of Fairview Street <br />Bridge over the Santa Ana River. <br /> <br />2. Approve an appropriation adjustment accepting funds in the amount of <br />$1,174,740 into the Select Street Construction Fund (account no. 59- <br />01-5343) and appropriating $1,174,740 to the Select Street <br />Construction Fund (account no. 59-551-6631) for the Fairview Street <br />Bridge Seismic Retrofit project. <br /> <br />3. Approve a Funding Analysis with a total estimated construction cost <br />of $1,704,100. <br /> <br />DISCUSSION <br /> <br />The bridge seismic retrofit project involves the Fairview Street bridge <br />over the Santa Ana River Channel (Exhibit 1). The project provides <br />various measures to minimize effect of a seismic event on the bridge. <br />The measures include tying the bridge girders together with steel cable <br />retainers, placement of additional piles at the bridge abutments, and <br />construction of pile caps. The proposed retrofit improvements will <br />enhance public safety on the bridge. <br /> <br />The Notice Inviting Bids was advertised on October 28 and 31, 2005, and <br />bids were opened on December 7, 2005. A summary of the bid invitations <br />mailed, the bids received, and the bid results follows. <br /> <br />23A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.