My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2006-01-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
01/17/2006
>
FULL PACKET_2006-01-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:48:59 PM
Creation date
1/11/2006 12:18:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />not exceed a maximum total number of three hundred (300) containers annually. <br /> <br />Notwithstanding the above, at any time that the CITY determines that the number of collections <br />and/or the number of roll-off containers provided for in section (c) is not adequately meeting the <br />CITY'S needs, then the CITY and CONTRACTOR agree to meet and confer regarding these <br />provisions, and may, by mutual agreement, modify the number of collections and/or roll-off containers. <br /> <br />14. COLLECTION. RECYCLING. YARD WASTE DIVERSION AND DISPOSAL <br />REQUIREMENTS: <br /> <br />(a) CURBSIDE SERVICE: CONTRACTOR shall provide each Curbside Service Unit within <br />the CITY with a minimum of three (3) Solid Waste collection and Recycling plastic carts. Any <br />provision of less than three (3) such plastic carts to any Curbside Service Unit shall be approved by the <br />Executive Director. Each Solid Waste plastic cart shall be a different color as described in Section 12 <br />above. CONTRACTOR shall be required to collect contents of each Solid Waste plastic cart once per <br />week and CONTRACTOR shall be required to process the contents of said plastic carts as follows: <br /> <br />(1) Non-Recyclable Solid Waste Collection and Recycling Plastic Carts: Contents of <br />plastic carts containing Solid Waste shall be hauled directly to a legally authorized Disposal Site <br />pursuant to subsection (e) herein. <br /> <br />(2) Recyclable Solid Waste Collection and Recycling Plastic Carts: The contents of <br />containers containing Recyclable Solid Waste shall be hauled to a Material Recovery Facility ("MRF"), <br />which MRF shall be acceptable to the CITY, for Processing and diversion. All Solid Waste transported <br />to said MRF shall be processed and the portion thereof which is recyclable shall be recycled by Waste <br />Type in amounts so as to comply with CIWMA and the CITY'S Source Reduction and Recycling <br />Element ("SRRE"). In the event that the MRF approved by the CITY is not operated by the <br />CONTRACTOR, CONTRACTOR will be responsible to subcontract for the use of such a facility so as <br />to ensure the CITY'S compliance with CIWMA. <br /> <br />(3) Yard Waste Collection and Recycling Plastic Carts: The contents of the plastic <br />carts containing Yard Waste will be transported to a Composting Facility which meets all state, federal <br />and local laws for Yard Waste Diversion and which is acceptable to the CITY. CONTRACTOR shall <br />be responsible to ensure that the Yard Waste collected by CONTRACTOR is diverted in compliance <br />with CIWMA and the CITY'S SRRE. <br /> <br />(b) BIN SERVICE: CONTRACTOR shall operate a Recycling program as described herein <br />for Bin Service. Such Recycling program shall require that CONTRACTOR take the Solid Waste in <br />bins which have clean "dry" loads to a MRF which is acceptable to the CITY for Processing and <br />diversion. CONTRACTOR shall guarantee that, at a minimum, fifty (50%) percent of the tonnage of <br />Solid Waste which is contained in bins and which is determined to have a high recyclable content will <br />be transported to a MRF. All Solid Waste which is transported to said MRF shall be processed and the <br />portion thereof which is recyclable shall be recycled by Waste Type in amounts so as to comply with <br />CIWMA and the CITY'S SRRE. In the event that the MRF approved by the CITY is not operated by <br />the CONTRACTOR, CONTRACTOR will be responsible to subcontract for the use of such a facility <br /> <br />13 <br /> <br />25A-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.