Laserfiche WebLink
@ <br />Steve estimated an impressive list of projects in master planning phases, providing feasibility studies, cost <br />i comparisons and master scheduling. He is familiar with the requirements of the California Department of <br />Education (CDE) and the Department of the State Architect (DSA), as they pertain to cost estimating. <br />e9 <br />Cumming, LLC located at 30250 Rancho Viejo, Suite F, San Juan Capistrano, CA 92675, (949) 234-1770. <br />Established in 1996, Gumming, LLC provides cost estimating and value engineering services to design <br />professionals and owners. We offer our clients the latest in aggressive time and coat control methods <br />�i available to the industry. By combining the most advanced database, graphic and spreadsheet capabilities <br />with exceptional professional expertise and experience we create estimates that become valuable <br />management tools. With offices in San Juan Capistrano, Los Angeles, and San Diego our staff of over 50 <br />construction professionals provide reliable accurate cost estimates and are able to meet the most critical <br />® deadlines for our clients. Cumming, LLC has a documented track record in the successful implementation of <br />construction programs for owners with complex projects. The principal and proposed project manager have a <br />comprehensive range of construction, design and owner's representation experience to serve the best interests <br />of the City of Santa Ana. <br />Task: The Cost Consultant will provide a Schematic Design Cost Estimate and update that estimate at the <br />�i 90% Construction Level. William S. Rodgers, CCC will be directly responsible to Don Gillis throughout the <br />project for cost estimation at the various stages of the project. He will attend those project committee <br />meetings involving all discussions of project cost estimation. <br />® Representative projects include: <br />• Long Beach Water Administration Facility Renovation — Long Beach, California <br />® • Park View Business Center, Corona, California <br />• Hewlet Packard Buildings 7,9, and 11, San Diego, California <br />® . California Western School of Law, San Diego, California <br />. Grand Avenue Office Building, Los Angeles, California <br />• San Marcos Town Center, San Marcos, California <br />• Burbank Environmental Center, Burbank, California <br />Geotechnical Engineer, Sean Colorado will be directly responsible to Don Gillis throughout the project <br />® for soils analysis and geotechnical services for the AVIA Transit facility. Mr. Colorado's twelve years in the <br />construction industry includes over nine years performing geotechnical studies and providing geotechnical <br />consulting services. Activities in the geotechnical field have included site investigations, foundation design <br />development, landslide mitigation, seismic hazard evaluations and mitigation design, grading control, forensic <br />® evaluations, and rehabilitation design. Geotechnical projects, which involved participation in design and <br />construction, included numerous retail, medical, military, commercial and industrial facilities, single and <br />multiple unit residential developments, public and private schools, and various municipal facilities and <br />improvements. <br />Mr. Sean Colorado, RCE <br />Leighton & Associates <br />3939 Murphy Canyon Road, Suite B 205 <br />San Diego, C4 92123 <br />Telephone - (858) 292-8030 <br />EDUC47TON <br />B.S. Civil Engineering, San Diego State University, 1992 <br />Advanced Studies in Geotechnical Engineering, San Diego State University <br />