My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
W. KOO & ASSOCIATES 1B - 2005
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
W. KOO & ASSOCIATES 1B - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:24:00 PM
Creation date
1/23/2006 12:50:24 PM
Metadata
Fields
Template:
Contracts
Company Name
W. Koo & Associates
Contract #
A-2005-104
Agency
Public Works
Council Approval Date
5/16/2005
Insurance Exp Date
9/30/2007
Destruction Year
2011
Notes
Amends A-1998-158, A-2003-130
Document Relationships
W. KOO & ASSOCIATES 1 - 1998
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
W. Koo & Associates 1a
(Amends)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\W-X (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'-' <br /> <br />Earth Mechanics;1nc. <br /> <br />~ <br /> <br />GCCi'("chni~:dl & EarthOJCike Engineering <br /> <br />April 6, 2005 <br /> <br />EMI Proposal No. P05-023 <br /> <br />W. Koo and Associates, a Division ofPBS&J <br />600 The City Parkway West, Suite 310 <br />Orange, California 92868 <br /> <br />Attention: <br /> <br />Mr. Dan Weddell <br /> <br />Subject: <br /> <br />Proposal for Geotechnical Construction Support Services <br />First Street and Fifth Street Bridges Crossing Santu Ana River <br />Santa Ana, California <br /> <br />Dear Mr. Weddell: <br /> <br />Earth Mechanics, Inc. (EMI) is pleased to support you by providing geotechnical services during <br />foundation pile driving at the subject bridge sites. Based on the discussions with you, EMI will observe <br />pile driving operation including compiling a record of the hammer blowcounts and comparing these <br />blowcounts with the axial demand and acceptance criteria shown on the contract plans and specifications, <br />respectively. Since the axial demand on the Fifth Street pilings is zero because the pilings were designed <br />for lateral loading only, our services would be limited to the First Street bridge. <br /> <br />Shortly after completion of the pile driving, EMI can provide a letter report summarizing the results of <br />our field observations. EMI will provide services during construction on a time and materials basis. Our <br />Year 2005 fee schedule is attached for reference. <br /> <br />We have developed the following manhour and cost breakdown for estimating purposes: <br /> <br />Senior Technician (24 days @ 8 hours per day@ $95 per hour). ....................................................$18,240 <br />Senior Engineer (10 hours@$120per hour) .................................................................................... 1,200 <br /> <br />Mileage ............................................................................................................................................... 100 <br />TOTAL ......................................................................................................................... .............. ........$19,540 <br />.4-hour minimum per site visit <br /> <br />If you have any questions or require additional information please feel free to call me. We appreciate the <br />opportunity to be of assistance. <br /> <br />Sincerely, <br />EARTH MECHANICS, INC. <br /> <br />L~ <br /> <br />Project Manager <br /> <br />Encl. <br /> <br />17660 Newhope Street, Suite E, Fountain Valley, California 92708 Tel: (714) 751-3826 Fax: (714) 751-3928 <br /> <br />EXHIBIT A 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.