<br />Change Order No. 1 <br />Project No. 05-3197 <br />February 21, 2006 <br />Page 2 <br /> <br />On September 19, 2005, the City awarded a contract for the Main Street <br />Water Main Improvements Project to A. R. Sarmiento, Inc. for the <br />estimated amount of $341,220 plus a ten percent contingency totaling <br />$375,342. This project provides for construction of a new water main and <br />appurtenances along Main Street from MacArthur Boulevard to Sunflower <br />Avenue. <br /> <br />The following three items are responsible for the cost increases: <br /> <br />1. The limited access to the Hutton Center offices has prompted the <br />request to have the contractors work longer hours and Saturdays to <br />mitigate the impact to the offices and to complete the project as <br />soon as possible. <br /> <br />2. During construction, concrete pavement was encountered beneath the <br />existing asphalt street. The concrete, estimated to exist along the <br />entire length of the project, was not shown on the plan. <br /> <br />3. At several locations existing utilities were in conflict with the <br />new water main. To work around these utilities the contractor needs <br />to install the water main at a lower depth. <br /> <br />These unforeseen conditions will result in additional costs related to <br />overtime work, saw cutting, demolition, disposal, and installation of the <br />water main at a deeper level. The extra work will be done on a time and <br />materials basis. <br /> <br />Since this change order will exhaust the project contingency, the <br />Council's approval is required to cover this extra cost and preserve the <br />project's contingency for any additional project unforeseen conditions. <br /> <br />Estimated cost = $69,500 <br /> <br />FISCAL IMPACT <br /> <br />The cost for the change order is estimate at $69,500. Funds are available <br />in the Water Utility Capital Projects Fund (account no. 66-579-6635). <br /> <br />APPROVED AS TO FUNDS AND ACCOUNTS: <br /> <br />/c2e~~fi- ~~ r"---.-- <br /> <br />James G. ROss . <br />Executive Director <br />Public Works Agency <br /> <br />~~,,(~ <br /> <br />~~rancisco Gutierrez <br />V Executive Director <br />Finance & Mgmt. Services Agency ./ <br />. ~ (- <br /> <br />23A-2 <br />