Laserfiche WebLink
<br />renderings, slides, sketches and correspondence. <br /> <br />V. DESIGNATED REPRESENTATIVES <br /> <br />A. Project shall be under direct control of Mr. William B. Harper, to whom all questions <br />may be directed. Field investigation shall be under direct control of Mr. Andre <br />Harper It is understood the City's representative will be Mr. Steve Worrall, who will <br />provide the interface between the City's Staff and Consultant. <br /> <br />VI. COST ESTIMATE <br /> <br />A. Based on previously noted Scope of Work - Investigation, cost for performing <br />services will not exceed $1,805. <br /> <br />B. Based on previously noted Scope of Work - Specifications, cost for performing <br />services will not exceed $2,7] 0, based on accomplishing work with item A. above. <br /> <br />C. Based on previously noted Scope of Work - Inspection, cost for performing services <br />will not exceed $5,460, based on project duration offourteen (14) days The estimate <br />is based on Inspector working 8 hours per day, 5 days per week, Monday through <br />Friday. Inspection hours are based on the hourly rate of$48.75 per hour. Cost also <br />includes attendance at the Pre-Construction Conference. <br /> <br />D. Additional meetings and work as directed by City = Hourly basis or negotiated fee <br />