Laserfiche WebLink
<br />I.C.E. SuiJders, Inc. <br /> <br />EXHIBIT A. <br /> <br />PROPOSAL <br /> <br />Date 2/11/02 <br /> <br />To: The Depot at Santa Ana <br />City of Santa Ana <br />1000 East Santa Ana Blvd. Suite 108 <br />Santa Ana, California 92701 <br />Attn: Carolyn Fullerton Fax No. 714/565-2693 <br /> <br />Project: Suite 108 Remodel <br /> <br />Our price to furnish all labor and ,material to relocate existing front wall is as follows: <br /> <br />Remove existing counter and shelves. <br />Remove existing Fascia and relocate to new Pony Wall. <br />Remove and relocate window wall and door. <br />Build new Drywall Metat stud pony wall. <br /> <br />Project to take 14 calendar days maximum. <br /> <br />Painting and electrical by others. <br /> <br />Total lump Sum Price <br /> <br />$4,813.00 <br /> <br />GENERAL CONTRACTOR <br /> <br /> <br />Date: 2/11/02 <br /> <br />OWNER <br /> <br />The Depot at Santa Ana <br /> <br />] ACCEPT <br />) DO NOT ACCEPT <br />I <br /> <br />by: <br />Title: <br /> <br />(Sjgnature) <br /> <br />Date: <br /> <br />I.C.E. Builders, Inc. 421 E. Cerritos Avenue Anaheim, Ca. 92805 714/491.1:117 Fax 714/491-7743 <br />