My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2006-03-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
03/06/2006
>
FULL PACKET_2006-03-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2016 4:44:52 PM
Creation date
3/1/2006 11:46:59 AM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />Planning Commission Action 0 ' <br />itiaucauon lsi <br />PLANNING COMMISSION MEETING DATE: <br />FEBRUARY 13, 2006 <br />TITLE: <br />PUBLIC HEARING - FILED BY FAIRHAVEN <br />MEMORIAL PARK FOR CONDITIONAL USE PERMIT <br />NO. 2005-33 TO ALLOW THE EXPANSION OF AN <br />EXISTING CEMETERY <br />PLANNING COMMISSION SECRETARY <br />APPROVED <br />❑ As Recommended <br />❑ As Amended <br />❑ Set Public Hearing For <br />DENIED <br />❑ Applicant's Request <br />❑ Staff Recommendation <br />CONTINUED TO <br />Prepared by Karen Haluza <br />�'� '��Gt„A� r �•-( � AL1 c.� <br />Executive Director Planning WiKaaer <br />RECOMMENDED ACTION <br />1. Approve and adopt the Mitigated Negative Declaration and Mitigation <br />Monitoring Program, Environmental Review No. 2005-28. <br />2. Adopt a resolution approving Conditional Use Permit No. 2005-33 as <br />conditioned. <br />Prior Planning Commission Action <br />On January 23, 2006 the Planning Commission held a public hearing to <br />consider this proposed project. During that meeting the Planning <br />Commission expressed concerns with the quality of the mausoleum <br />architecture, the seeming incongruity of the semi -private mausoleums and <br />pavilion building architecture with the community mausoleum, the quality <br />of the building materials and that they lack the sense of permanence <br />such a structure demands and that materials such as real stone would <br />provide. The Commission requested more detail on the community <br />mausoleum windows as the plans were not clear as to whether the windows <br />were faux or real. The Commission recommended that any spandrel glass <br />be replaced by granite niches or decorative ironwork. The Commission <br />also requested more detail about how the interior of the community <br />mausoleum would work and what the other elevations would look like. <br />The Commission also discussed the need for a signal, or other form of <br />protected pedestrian crossing, between the existing southern cemetery <br />and the proposed northern expansion. The Commission directed staff to <br />work with the applicant to answer these questions, work to improve the <br />building materials and architecture and provide further details. After <br />the public hearing was conducted, the Commission voted to continue the <br />item to the meeting of February 13, 2006. <br />EXHIBIT A <br />ik <br />
The URL can be used to link to this page
Your browser does not support the video tag.