My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2006-03-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
03/06/2006
>
FULL PACKET_2006-03-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2016 4:44:52 PM
Creation date
3/1/2006 11:46:59 AM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan. The proposed project would not significantly increase <br />the demand for wastewater service over current levels <br />wastewater demand within the project area. Through the <br />City's development review process, the Public Works <br />Department has indicated that the City would have the <br />ability to provide adequate waste water service to the <br />project site. The proposed project would be required to <br />provide appropriate sewer connection fees with the City of <br />Santa Ana and the Orange County Sanitation District. <br />No adverse impacts in regards to the provision of adequate <br />wastewater service would be associated with the proposed <br />project. <br />C. Require or result in the construction of new storm <br />water drainage facilities or expansion of existing <br />facilities, the construction of which could cause <br />significant effects. <br />Less Than Significant Impact <br />The project site is located within an urbanized area with <br />improved drainage facilities. Implementation of the <br />proposed project would not significantly increase the <br />amount of surface water runoff generated from the project <br />site. Implementation of the proposed project would not <br />require the construction of new drainage facilities that <br />would impact the environment. <br />D. Are sufficient water supplies available to serve the <br />project from existing entitlements and resources or <br />are new or expanded entitlements needed? <br />Less Than Significant Impact <br />The proposed project is consistent with the General Plan <br />and the water demands for the project are accounted for the <br />in the City's Urban Water Management Plan. Through the <br />City's development review process, the Public Works <br />Department has indicated that the City would have the <br />ability to provide adequate water service to the project <br />site. No adverse impacts in regards to the provision of <br />adequate water service would be associated with the <br />proposed project. <br />F. Is the project served by a landfill with sufficient <br />permitted capacity to accommodate the project's solid <br />waste disposal needs? <br />33 <br />31A748 <br />
The URL can be used to link to this page
Your browser does not support the video tag.