Laserfiche WebLink
db\Env Form CEQA Chklst 31A 75 8 Page 6 of 9 <br />Potentially <br />Significant <br />Potentially <br />Unless <br />Less Than <br />Significant <br />Mitigation <br />Significant No <br />Issues <br />& Supporting Information Sources <br />Impact <br />Incorporated <br />Impact Impact <br />C. <br />Substantially alter the existing drainage pattern of <br />❑ <br />❑ <br />( ❑ <br />the site or area, including through the alteration of <br />T� <br />the course of a stream or river, or substantially <br />increase the rate or amount of surface runoff in a <br />manner which would result in flooding on- or off- <br />site? <br />D. <br />Create or contribute runoff water which would <br />❑ <br />❑ <br />❑ <br />exceed the capacity of existing or planned storm <br />water drainage systems or provide substantial <br />additional sources of polluted run-off? <br />E. <br />Otherwise substantially degrade water quality? <br />❑ <br />[ <br />❑ ❑. <br />F. <br />Place housing within a 100 -year floodplain, as <br />❑ <br />❑ <br />❑ j <br />mapped on a federal Flood Hazard Boundary or <br />i <br />Flood Insurance Rate Map or other flood hazard <br />delineation map? <br />G. <br />Place within a 100 -year floodplain structures which <br />❑ <br />❑ <br />❑ <br />would impede or redirect flood flows? <br />H. <br />Expose people or structures to a significant risk of <br />❑ <br />❑ <br />❑ jam' <br />loss, injury, or death involving flooding, including <br />�' \ <br />flooding as a result of the failure of a levee or dam. <br />I. <br />Result in an increase in pollutant discharges to <br />❑ <br />❑ ❑ <br />receiving waters? Consider water quality <br />parameters such as temperature, dissolved <br />oxygen, turbidity and other typical storm water <br />pollutants (e.g. heavy metals, pathogens, <br />petroleum derivatives, synthetic organics, <br />sediment, nutrients, oxygen -demanding <br />substances, and trash) <br />J. <br />Result in significant alteration of receiving water <br />❑ <br />❑ ❑ <br />quality during or following construction? <br />K. <br />Could the proposed project result in increased <br />❑ <br />[ <br />❑ ❑ <br />erosion downstream? <br />7 <br />L. <br />Result in increased impervious surfaces and <br />❑ <br />❑ <br />❑ <br />associated increased runoff? <br />db\Env Form CEQA Chklst 31A 75 8 Page 6 of 9 <br />