Laserfiche WebLink
- EARTH MECHANICS INCORPORATED <br />MEMORY LANE STREET AND BRIDGE WIDENING <br />CONSTRUCTION GEOTECHNICAL SUPPORT SERVICES <br />tet:nu untrue axn rncT <br /> <br />TASK Project <br />hlana er Senior <br />En ineer Project <br />En ineer <br />Senior Tec <br />Clerical Total <br />Hours <br />Total Cost (S) <br />Res onse [o AFI 8 0 10 0 2 20 $2,490.00 <br />Ins ection of Pile Drivin 0 0 0 150 0 150 $14.250.0 <br />Ae ort Pre aration 1 2 8 0 1 12 $1,230.00 <br />Project Meetin s 8 0 8 0 0 16 $2,200.00 <br /> <br />Total hours ]7 2 26 150 3 198 <br />Hourl Rate $ $180.00 $120.00 $95.00 $95.00 $50.00 <br />Subtotal $3,060.00 $240.00 $2,470.00 $14,250.00 $150.00 $20,170.0 <br />OTHER COSTS <br />Field Vehicle li Da s $50 er Da $710.00 <br />Outside Re roduction, Shi in ,and Miscellaneous $>50.00 <br /> <br />Subtotal $1,300.00 <br />TOTAL $21,470.0 <br />Note: <br />EMI's services will be provided on an as-needed and time-and-material basis. <br />