My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2006-03-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
03/20/2006
>
FULL PACKET_2006-03-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:47:58 PM
Creation date
3/15/2006 8:55:55 AM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. ADAPTIVE REUSE OF SPURGEON BUILDING <br />No submittals of plans from Jay Meehan at this time. <br />4. DOWNTOWN RESIDENTIAL PARKING- UPDATE <br />Danell Mercado stated that the Association is not meeting until January 2006. <br />She shared with the Committee a DRAFT letter to be sent out immediately <br />informing the loft owners of their option to parking in the Downtown Parking <br />Structures. <br />5. LOFT SURVEY UPDATE <br />Danell Mercado will make further contact with the Association in writing asking <br />for responses to the survey to be returned in aself-addressed stamped <br />envelope. <br />6. SANTA ANA BOULEVARD RENAISSANCE PROJECT <br />Lucy Linnaus, Assistant Planner, reviewed with the committee the boundary lines <br />of the study area. Staff asked the committee for input on three areas of the <br />boundaries. The boundary line next to French Park will remain the same. The <br />area west of Logan will be included, as well as the cut out at Grand and First <br />Street. <br />Pat Whitaker provided the committee a map that delineated which properties <br />within the study area were Agency owned. The committee requested staff to <br />provide a write up on which properties could be potentials for demolition due to <br />nuisance and unsafe conditions <br />7. PROJECT UPDATES <br />a) 4T" Street Pushcart Status - <br />The manufacturer made the umbrellas for the carts in rainbow colors. Staff <br />informed the manufacturer that a solid color such as maroon or green would <br />be more acceptable. The manufacturer is getting estimates to change out the <br />color to a solid. The manufacturer is guaranteeing delivery between February <br />and March. <br />b) SC Gas Building <br />Chapman College has made a purchase offer and a tour has been schedule <br />with them in December. <br /> <br /> <br /> <br />c:iry Council Committee on Main <br />Street Development -Minutes <br />2 <br />December 1, 2005 <br />13B-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.