My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2006-03-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
03/20/2006
>
FULL PACKET_2006-03-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:47:58 PM
Creation date
3/15/2006 8:55:55 AM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c) Phase III Olson Lofts Status <br /> <br />A new architect was hired. Working drawings are to be submitted in March. <br />Construction by March 2007. Staff noted that if a temporary parking lot is <br />provided, it might be a problem when it is taken away. A construction cost <br />estimate sheet ($169,820) for the Olson Parking Lot (phase 3) was provided. <br />d) Otis Building Update <br />A copy of the email received regarding OCTA willingness to move the bus <br />stop was provided to Committee member Solorio. <br />e) Construction of Archway Sign on South Main Street <br />George Alvarez provided pictures of possible signs located ,at Main Street <br />looking south at Broadway and Main Street at Walnut looking north. Cost <br />estimates are $900K for the Broadway sign and $700K for the Walnut sign. <br />The Committee would like to concentrate on the Broadway location. <br />f) Nexus Entry Sign Update <br />Renderings of the sign were provided. The Committee feels that the City seal <br />should be removed and that up lighting should be considered. <br /> <br />g) Loft Survey Update <br />Seventy-five survey letters were distributed to individual loft owners in late <br />December. Self-addressed envelopes were provided and responses were <br />requested by January 15. To date, fifteen responses have been received. A <br />letter was also mailed to loft owners regarding additional parking options. <br />h) The Depot Marketing Plan Update <br /> <br />Pat Whitaker discussed the timeline <br />Councilmembers in November. She <br />consultant had been hired to work with <br />Depot. <br />6. PUBLIC COMMENTS -None <br />as per the memo <br />also mentioned that <br />The Cafe Express <br />distributed to <br />a restaurant <br />located in the <br />wry councu committee on Main <br />Street Development -Minutes <br />3 <br />13B-15 <br />January 5, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.