My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2006-03-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
03/20/2006
>
FULL PACKET_2006-03-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:47:58 PM
Creation date
3/15/2006 8:55:55 AM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />MARCH 20, 2006 <br />TITLE: <br />r n'~ <br />.Education {S~ <br />CLERK OF COUNCIL USE ONLY: <br />CONTRACT AMENDMENTS FOR <br />ASPHALT STREET MAINTENANCE <br />AND ASPHALT POTHOLE REPAIR <br />AND SIDEWALK MAINTENANCE <br />(SPEC. NOS.04-010 AND 04-046) <br />U~~~ <br />CITY MANAGER <br />RECOMMENDED ACTION <br />APPROVED <br />^ As Recommended <br />^ As Amended <br />^ Ordinance on 1st Reading <br />^ Ordinance on 2nd Reading <br />^ Implementing Resolution <br />^ Set Public Hearing For <br />CONTINUED TO <br />FILE NUMBER <br />1. Amend the contract with Hardy and Harper, Inc. for asphalt street <br />maintenance by $330,000 for a total not to exceed $656,910. <br />2. Amend the contract with Hardy and Harper, Inc. for asphalt <br />pothole repairs and sidewalk maintenance by $200,000 for a total <br />not to exceed $525,000. <br />DISCUSSION <br />The Public Works Agency's Maintenance Services Division is responsible <br />for maintaining the street and sidewalks of Santa Ana. In order to do <br />so, contracts for annual asphalt street maintenance, pothole repair and <br />sidewalk maintenance are required. <br />Services provided under the asphalt street maintenance contract include <br />the excavation and cold milling of existing roadways, the installation <br />of pavement reinforcement fabric, construction of asphalt concrete <br />pavement, and crack sealing. Services provided under the pothole <br />repair and sidewalk maintenance contract include the repair of all <br />potholes a minimum of six inches wide and one inch deep, and the repair <br />of damaged pavement areas not exceeding 25 sq. ft. in diameter and two <br />inches in depth with an asphalt overlay. Sidewalk maintenance provided <br />includes sidewalk ramping and sidewalk offset grinding, which are used <br />to reduce risks to pedestrian traffic. <br />In addition, the asphalt street maintenance contract provides for <br />repair of pavement affected by water system maintenance. This includes <br />the repair of water and sewer line trenches and the adjustment of <br />manhole and water valve covers to the new street surface level. <br />22A-1 <br />3~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.