My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CONSOLIDATED DATA CONTROLS 3 - 2002
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
CONSOLIDATED DATA CONTROLS 3 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:12:52 PM
Creation date
3/16/2006 3:42:34 PM
Metadata
Fields
Template:
Contracts
Company Name
Consolidated Data Controls
Contract #
N-2002-184
Agency
Public Works
Expiration Date
6/30/2003
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, , <br /> <br />CONSOLIDATED DATA CONTROLS <br />1550-F Anaheim Blvd., Anaheim, Ca. 92805 <br />(714)772-3300 (714)772-3301 FAX <br /> <br />August 30, 2002 <br /> <br />CITY OF SANTA ANA <br />PUBLIC WORKS MAINT., M-8 <br />CORP. YARD / BLDG A <br />220 S. Daisy SI. <br />Santa Ana, Ca. 92703 <br /> <br />ATTENTION: NABIL SABA <br /> <br />REFERENCE: PROPOSAL FOR AS-BUILT TIME AND MATERIAL WORK <br />VARIOUS SITES IN THE CITY OF SANTA ANA <br /> <br />Mr. Saba: <br /> <br />As requested, following is a proposal to provide engineering and electrical services to develop <br />accurate as-built drawings at designated sites in the City of Santa Ana on a T & M basis as <br />follows: <br /> <br />1. INITIAL I!\'VESTIGA TION <br /> <br />a. Upon receipt of the following, commence with initial investigation at designated site to <br />determine true conditions: <br /> <br />o Copy of best available blue-line drawings for the designated site. <br /> <br />o As-built drawings of all panels & electrically operated equipment that can be <br />marked up to true conditions. <br /> <br />o 0 & M manuals for the designated site including any equipment supplied. <br /> <br />b. Assistance from district personnel to help uncover any "known" changes not reflected <br />in the as-built drawings or 0 & M manuals. This is to be an ongoing process as <br />needed throughout the course of the designed site investigation. <br /> <br />c. Confirm and update all field wiring numbers and number all unmarked wires in <br />accordance with electric code standards. <br /> <br />d. If any downtime is necessary, it will be coordinated with your staff to minimize any <br />possible operational interruptions. <br /> <br />e. The blue-line and as-built drawings will be "marked" in red for any and all <br />discrepancies found as exceptions to the drawings. <br /> <br />f. Upon completion at each site, a final report and marked drawings will be given to your <br />staff for outsourcing final drawings to true conditions found. <br /> <br />EXH'~'- A <br />
The URL can be used to link to this page
Your browser does not support the video tag.