Laserfiche WebLink
<br />Sent By: GC ENVIRONMENTAL RING; <br /> <br />714 632 9968 j <br /> <br />Oec-5-02 11 :40; <br /> <br />Page 19/34 <br /> <br />The Irvin~ Company <br /> <br />550 Newp'ort Center:Drive, Newport Beach, CA <br />92658-2129 <br /> <br />Mr. Norm Witt, Vice President <br />Mr. Dick Mandeville <br />(949) 720-2129 and (626) 864-8891 <br /> <br /> <br />University of Califotnia, Irvine <br />Facilities Management Department <br /> <br />Ci ofOiltario <br />303 East ~'B" Street, Civic Center, Ontario, CA 91764- <br />4196 <br /> <br />10.0 UMlTATIONS <br /> <br />A Phase I ESA does not typically include sampling and analysis. Other services can be provided to <br />further assess the site conditioll5. These services include, but are not limited to soil and groundwater <br />sampling. lead and asbestos building material surveys, wetlands surveys, radon surveys, and <br />environmentill compliaiu:e assessments. These services can be provided for additional fees. <br /> <br />The proposed scope of work requested by the Client is limited to evaluating environmental <br />concems associated with the potential presence of hazardous substances in conjunction with the <br />aforementiohed property. The scope of services described here is not intended to be inclusive, to <br />identify all potential concerns, or to eliminate the possibility of environmental problems. Within <br />current tec~ology, no level of assessment can show conclusively that a property or its structures <br />are completely free of :hazardous substances. Therefore, GeE will not assume any responsibility <br />or liability for any claim, loss of property value, damage, or injury which results from pre- <br />existing haiardous substances being encountered or present on the proj<<t site, or from the <br />discovery of such hazardous substances. Acceptance of this proposal will indicate that the Client <br />bas reviewed the scope of service and determined that additional testing and studies are not <br />required at this time. Any exceptions should be noted and may result in a change in fees. <br /> <br />GeE will perform its services in general accordance with the ASTM E 1527-97 "Standard <br />Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process". <br />No warrantY or guarantee, expressed or implied, is offered by this proposal. <br /> <br />15 <br />F:\O......w>ROPoSLICity of SUllo An.\OlP.12~J Eovil'OflCfllflllll Smiocol.doc: <br />