My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GC ENVIROMENTAL 1-2002
Clerk
>
Contracts / Agreements
>
G
>
GC ENVIROMENTAL 1-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 10:23:18 AM
Creation date
3/17/2006 2:24:26 PM
Metadata
Fields
Template:
Contracts
Company Name
GC Environmental
Contract #
N-2002-183
Agency
Community Development
Expiration Date
12/5/2003
Insurance Exp Date
1/1/2003
Destruction Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />sent By: GC ENVIRONMENTAL <br /> <br />RING' <br />'-' <br /> <br />714 632 9968j <br /> <br />OeC-5,,-, 11 :43; <br /> <br />Page 28/34 <br /> <br />. Mobil 00 Company - Numerous Sites Southern California <br /> <br />Conducted the assessment, characteriution and remediation of petroleum products released <br />from un4erground storage tanks (USTs) at over 30 locations. Activities included geophysical <br />surveys to locate subsurface structures; logging and sampling of near-surface and subsurface <br />soli; ins~ation of groundwater monitoring wells; groundwater sampling; review of analytical <br />data; grOundwater pumping and slug injection tests; and, assistance in installation of vapor <br />extractioit systems and groundwater pump and treat systems. <br /> <br />ChevroJi on Comt'any - Numerous Sites Southern California <br /> <br />Conducted the assessment, characterization and remediation of petroleum products released <br />from underground storage tanks (USTs) at over 30 locations. .Activities included geophysical <br />surveys to locate sUbsurface structures; logging and sampling of near-surface and subsurface <br />soil; inst/i1lation of groundwater monitoring wells; groundwater sampling; review of analytical <br />data; grOundwater pumping and slug injection tests; and, assistance in installation of vapor <br />extractioh systems ilnd groundwater pump and treat systems. <br /> <br />United States Department of DefeDse . Sacramento Army Depot Sacramento, CA <br /> <br />This project included completing two, 72-hour continuous groundwater pumping tests using <br />hydrostatic pressure transducers connected to a computerized data logger. Duties also included <br />data anaiyses and computer modeling of aquifer parameters based on the field data. <br /> <br />Leon's Other Place. wen InstaOation Mecca, CA <br /> <br />Supervised the installation of groundwater monitoring wells, sampling of groundwater, and <br />product recovery at a privately owned and operated gasoline service station receiving flUIds <br />from the: State ofCalifomia LeIlldng Underground Storage Tank (LUST) fund. <br /> <br />Jones Family Trull - AssessmentlSlte aosure San Diego, CA <br /> <br />Conducted an assessment for the purpose of obtaining UST site closure from the primary <br />regulatoi)' agency prior to the tranSfer of properly ownership. Followed the newly released <br />January :1996 California Regional Water Quality Control Board (RWQCB) guidelines for a <br />gro~dwater area that had been declared as a "non-beneficial use" region. The project involved <br />removin~ one UST; subsurface soil sampling for petroleum hydrocarbon compounds in the <br />areas of the UST.: product line, and dispenser; characterization of the contamination in the <br />subs.e; installation of one groundwater monitoring well; and groundwater sampling. <br />Althougll petroleUm contamination was found in soil and groundwater samples, the <br />concentrations were below the San Diego Regional Water Quality Control Board (SDRWQCB) <br />concentrations of concern, and the SDRWQCB issued a Letter of Closure. <br /> <br />Phose n Environmental Site Assessment Experience; <br /> <br />Confidential BllJIking CUeDt-Numerous Sites Throughout California <br /> <br />On two. occasions; project managed a group of Phase n ESAs for the takeover of assets of <br />another bank by our client bank. One set.had a total of four sites, and the other had six sites. <br />Both sets of reports were required by the client to be completed within a span of four weeks, <br /> <br />F;~ROPOSL\City.or SIn... Ana\021'- J 2..093 Environcmntal Scnic:c:sLdo~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.