Laserfiche WebLink
<br />Assist Cily in conducting Pre.Bid Conterence to ensure prospective bidders <br />arc totally aware of scope of work and1local conditions, <br /> <br />a, Prepare minutes of Pre.Bid ~onference covering all aspects of <br />contractor's queslions and clarjfications of project and mail to all <br />attendees and become part of tJ contract documentation, <br /> <br />Assist City in telephone evaluati n of bids received and make <br />recommcndations for award or rejectio , <br />I <br />Assist City in conducting Pre.Construct(on Conference to enable all relevant <br />parties to comprehend scope of project,lmplementation of specification and <br />City requirements, I <br /> <br />a, Prepare minutes ofPre.construcLn Conference covering all aspects <br />of contractor's questions and clarifications of project and present to <br />all parties. I <br />I <br />Assist City in review and approval oft Contractor submittals and project <br />procedures. Rejected submittals would bt supplemented with an explanation <br />of the reason for rejection and requirem1nts for re-submittal. <br /> <br />SCOPE Of WORK. INSPECTION i <br />! <br /> <br />SURFACE PREPARATION INSPEdTlON (INTERlOR) . Physical <br />inspection of blast cleaned surfaces to 1erifY compliance to specification. <br />removal of dust, etc. , I <br /> <br />a. Weather conditions will be veri~ed by use of a electronic or sling <br />ps~'chrometer to determine sui tab lity of climatic condilions prior to <br />and during all blast cleaning ope tions, <br /> <br />Surface will be obscrved throUgholll cleaning operations to dctermine <br />compliance with specifications, I <br />I <br />MATERIAL APPLICATION INSPECT\O}; (INTERlOR) - After approval <br />of surface preparation, ongoing inspeclion monitors weather condition. <br />Contractor's application equipment and ifs operation, mixing and physical <br />inspection of application, including spray lechniques, cleanliness of surface, <br />. kn I <br />thlc ess, etc, I <br /> <br />~.\P : I <br /> <br />." <br /> <br />D. <br /> <br />2. <br /> <br />Proposal (or EvaJu'lion "nd Specification <br />City o(Santa Ana. Walnut Reservoir <br />I August S, 2002 <br /> <br />concerning bidding of the project and hreparation of Jddenda as reqUired to <br />document deSign changes or clarilica(;ons, <br />, <br /> <br />7. <br /> <br />8. <br /> <br />9. <br /> <br />10. <br /> <br />1. <br /> <br />b. <br /> <br />Harp"r & Associates Engineering. Inc, <br />proposals\SE1nlaAnD~ Waln uf .cone <br /> <br />~'''l <br />" <br /> <br />3 <br />