Laserfiche WebLink
<br />,..... \ <br /> <br />, ,~~ <br />"'cl ....... -. d:t1 <br />n}olerh::tIC.':,.. <br />::~::'./I;'D:jr{~ 2:.~t3~ <br /> <br />EXHiBiT <br /> <br />I' "" O' <br />J fL.; ,; <br />k=ll. <br /> <br />Sl..:itaA <br />1920 E2!st 'Warr:cr Aierd..!S <br />Sc~ta A"':3, CA 92705 <br /> <br />Fr:cr;e: (949j 955-0201 <br />Fax: (94g} 95540965 <br /> <br />hy,;:ere:ics Er.'11ronm~:it2!r Serii::es, Inc. <br /> <br />F~bruary 28, 2001 <br /> <br />" II <br /> <br />Mr. St~ve Worrall, P.E. <br />City of Santa Ana <br />Wat~r Resources Di\ision <br />Public Work Agency <br />220 S. Daisy Avenue <br />Santa Ana, California 92703 <br /> <br />RE: Proposal for Asbestos and Lead-Based PaInt Consulting Senices for the \Yell #14 Pump Building, <br />Hydro-Generator Building, Resen'olr and Yard Piping at 2401 Brislql Avenue, Santa Ana, California. <br /> <br />Hygienetics Propos"l Number LA01l125R . <br /> <br />.I-I-' <br /> <br />D~ar Mr. Worrall: <br /> <br />-,' <br /> <br />Hygien~tics Environmental Services, Inc. is pleased to present the following proposal to provid~ environmental <br />consulting services for the interior and exterior of Well #14 Pump Building, Hydro-generator Building, Reservoir <br />and Yard Piping at 240 I Bristol Avenue, Santa Ana, California. This proposal specifically addressos th~ asbestos and <br />lead abatement, whicb will be nec~ssary before the material, is disturbed during the demolition pbase of the project A <br />daily rat~ to provide abatem~nt oversight as well as a rat~ to provide closeout documentation is indicated below, <br />Hygienetics' Technician will visually observe the r~moval of polychlorinated biphenyl fluid from el~ctrical equipment <br />and th~ removal of m~rcury switches. It should b~ not~d that no sampl~s will b~ collect~d. Hygienetics will also <br />r~view the hazardous waste manifests for the disposal polychlorinated biphenyl fluid from the designated electrical <br />equipment and the mercury contained in switches. Hygienetics assumes that this work will occur during the asbestos <br />and lead abatement phase of the project. <br /> <br />Our not to exceed fee for this work is 59,817.00 <br />. <br /> <br />Scope of 'York for Asbestos and Lead Consulting Senices <br /> <br />1. Hygi~netics Environmental will attend one pre-construction meeting with the Abatement Contractor and the <br />City of Santa Ana to coordinate and re,'iew the requirem~nts as they relate the asb~stos and l~ad abat~ment. <br />Th~ Abatement Contractor will b~ r~quired to provid~ documentation to p~rform this work as well as provide <br />confirmation that th~ proper Agencies have be~n notified. In addition, Hygienetics will review the Abatement <br />Contractor Work Plan to ensure all regutatol)' requirem~nts will b~ followed; <br /> <br />2. During asbestos and lead abatement, Hygienetics will provide an Asbestos and Lead Abatem~nt Technician for no <br />more than 18 sbifts to perform compliance inspections, abatement air monitoring, and final clearance testing. <br />Asbestos air samples will be analyzed on-site using phase contrast microscopy. Lead air samples will be collected <br />in accordance with NIOSH Method 7082 and analyzed utilizing Flame Atomic Absorption. <br /> <br />3. Following completion of the abatement project, Hygienetics "ill provide City of Santa Ana with a Project <br />Summary Report and results of all sampling completed during the abatement. C?pies of contractor submittals and <br />records of daily inspections will also be included in our final report. <br /> <br />,,' <br />